Planning application
60 Hare Lane Claygate Esher Surrey KT10 0QU
Works: Extension Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of Condition 2 (Approved Plans) of planning permission 2021/1039 (Extensions) to add french doors to North side elevation and change windows and rooflight to the rear.
As published by the council, reference 2023/0001
Application record
- Reference
- 2023/0001
- Type
- Variation of Condition Under S73
- Status
- Final Decision
- Decision
- Granted As published: Grant Planning Permission
- Received
- 3 Jan 2023
- Validated
- 3 Jan 2023
- Decided
- 22 Mar 2023
- Ward
- Claygate Ward
- Decision by
- Officer delegated
- Postcode
- KT10 0QU
Site history
Applications at this address on the Elmbridge register
This site has had 4 applications since 2021: 3 approved, 1 refused.
-
2023/2263 Granted
60 Hare Lane Claygate Esher Surrey KT10 0QU
Single-storey rear extension following demolition of existing single-storey rear projection.
-
2022/3341 Refused
60 Hare Lane Claygate Esher Surrey KT10 0QU
Non-Material Amendments to planning permission 2021/1039 for alterations to ground and first-floor rear fenestrations and rooflight and add french doors to side elevation.
-
2021/1039 Granted
60 Hare Lane Claygate Esher Surrey KT10 0QU
Part two/part single-storey rear extension and alterations to fenestration following demolition of existing rear projection.
Timeline
Dates from the published record
-
3 Jan 2023
Received by Elmbridge
-
22 Mar 2023
Decision issued: Grant Planning Permission
-
30 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 22 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
60 Hare Lane Claygate Esher Surrey KT10 0QU
Single-storey rear extension following demolition of existing single-storey rear projection.
Granted Householder Extension Demolition 19 docsSmall domestic -
60 Hare Lane Claygate Esher Surrey KT10 0QU
Part two/part single-storey rear extension and alterations to fenestration following demolition of existing rear projection.
Granted Householder Extension Demolition +1 23 docsSmall domestic -
60 Hare Lane Claygate Esher Surrey KT10 0QU
Non-Material Amendments to planning permission 2021/1039 for alterations to ground and first-floor rear fenestrations and rooflight and add french doors to side elevation.
Refused Amendments Loft or dormer Windows or glazing 18 docs -
66 Hare Lane Claygate Esher Surrey KT10 0QU
Tree Preservation Order EL:98/20 - T1-Oak tree- Crown reduce by 3m back to previous pruning areas. Current height 12m, will be left at 9m. Current width 11m, will be left at 8m. This tree is very large for the small back garden. It drops leaves & acorns into the garden, onto the roof & residents below. The tree also has OPM present which is a huge inconvenience to the property owners as they are afraid to venture into the garden. Branches have been breaking out and there is a lot of dead wood present & falling onto the neighbouring road as well as into the garden. The tree has a large cavity 2 meters up the main stem from a branch snapping out in the past. Ideally the home owner would like this tree removed & replaced with a more suitable tree. Removal of all dead wood.
Granted Trees 7 docs -
67 Hare Lane Claygate Esher Surrey KT10 0QX
Single-storey side extension following demolition of conservatory.
Granted Householder Extension Demolition 11 docsSmall domestic -
74 Hare Lane Claygate Esher Surrey KT10 0QU
Single-storey rear extension and alterations to fenestration following demolition of existing rear projection.
Granted Householder Extension Demolition +1 12 docsSmall domestic
Other amendment applications
In Elmbridge
-
2026/1677 Refused
Laurelwood Cavendish Road Weybridge Surrey KT13 0JY
Variation of Condition 4 (Tree Protection Measures) and 5 (Site Supervision) of planning permission 2025/1959 (Detached two-storey house with attached garage and associated landscaping following demolition of the existing house) to amend Tree Protection Plans and Tree Planting & Hard Surfaces Plan within approved arboricultural report.
-
2026/2363 Awaiting decision
Land off Anyards Road and Copse Road Cobham Surrey KT11 2LH
Non-Material Amendment to planning permission 2025/0373 to revise the landscape plan to remove the trees from the rear gardens of plots 1-8 and replace them within management controlled areas.
-
2026/1471 Granted
15 Chaucer Avenue Weybridge Surrey KT13 0SS
Variation of Condition 2 (Approved Plans) of planning permission 2025/3172 (Single-storey side and rear extension and extended patio following partial demolition of existing house) to relocate patio stairs and extend patio with an additional stepped level and balustrades.
-
2026/2340 Awaiting decision
Weybridge Health Centre 22 Church Street Weybridge Surrey KT13 8DW
Non-Material Amendment to planning permission to 2024/3065 to remove existing wall on part of the western boundary, relocation of bin store and partial reconstruction of the removed wall and to amend the wording of Conditions 8 (Cycle Parking), 15 (SuDS Verification) and 26 (Habitat Management and Maintenance Plan) to specify 'completed development'.
-
2026/2333 Awaiting decision
103 Grange Road West Molesey Surrey KT8 2PR
Removal of Conditions: 5 (Tree Protection Measures) and 6 (Site supervision) of 2024/3083 (Single-storey rear extension, rear dormer window and alterations to fenestration following partial demolition of rear projection) to remove tree conditions based on the findings of the report as the original conditions cannot be complied with.