Skip to content
PlanIndex Get alerts
Menu

Planning application

14 Sandown Avenue Esher Surrey KT10 9NT

Granted Elmbridge 2022/3751 Householder Application

Works: Extension Loft or dormer Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two-storey front extensions, two-storey rear extension, dormer windows, rear balcony, front gates and piers with relocation of existing access driveway and alterations to fenestration following removal of chimney.

As published by the council, reference 2022/3751

Application record

Reference
2022/3751
Type
Householder Application
Status
Final Decision
Decision
Granted As published: Grant Planning Permission
Received
14 Dec 2022
Validated
14 Dec 2022
Decided
7 Feb 2023
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 9NT

Site history

Applications at this address on the Elmbridge register

This site has had 2 applications since 2022: 1 approved, 1 refused.

  • 2022/2085 Refused

    14 Sandown Avenue Esher Surrey KT10 9NT

    Two-storey front extensions, two-storey rear extension, dormer windows, rear balcony, front gates and piers with relocation of existing access driveway and alterations to fenestration following removal of chimney.

    Decided 21 Nov 2022 Householder

Timeline

Dates from the published record

  1. 14 Dec 2022

    Received by Elmbridge

  2. 7 Feb 2023

    Decision issued: Grant Planning Permission

  3. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 7 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 14 Sandown Avenue Esher Surrey KT10 9NT

    2022/2085 Submitted 4 Jul 2022 50 yards away

    Two-storey front extensions, two-storey rear extension, dormer windows, rear balcony, front gates and piers with relocation of existing access driveway and alterations to fenestration following removal of chimney.

    Refused Householder Extension Loft or dormer +1 26 docs
    Domestic
  • Cluny Lodge 12 Sandown Avenue Esher Surrey KT10 9NT

    2025/0249 Submitted 30 Jan 2025 50 yards away

    Variation of Condition: 2 (Approved Plans) of planning permission 2024/0062 (First-floor side/front extension, single-storey rear, side and front extensions and alterations to fenestration following partial demolition of existing house) to increase the eaves and ridge height by 0.375m

    Granted Amendments Extension Roofing +2 8 docs
    Small domestic
  • Cluny Lodge 12 Sandown Avenue Esher Surrey KT10 9NT

    2024/0062 Submitted 11 Jan 2024 50 yards away

    First-floor side/front extension, single-storey rear, side and front extensions and alterations to fenestration following partial demolition of existing house.

    Granted Householder Extension Demolition +1 14 docs
    Small domestic
  • The Farm Cottage 38 New Road Esher Surrey KT10 9NU

    2024/1031 Submitted 22 Apr 2024 50 yards away

    Tree Preservation Order ESH:97 - Crown reduce 1 x Mature Blue Atlantic Cedar.

    Granted Trees 6 docs
  • 17 Sandown Avenue Esher Surrey KT10 9NT

    2020/3403 Submitted 8 Dec 2020 50 yards away

    Single-storey rear extension, rear first-floor balcony over existing rear projection and alterations to fenestration.

    Granted Householder Extension Windows or glazing 14 docs
    Small domestic
  • 19 Sandown Avenue Esher Surrey KT10 9NT

    2022/2104 Submitted 5 Jul 2022 50 yards away

    Confirmation of Compliance with Condition 6 (Tree Protection Measures (With Pre-Commencement Meeting) of planning permission 2022/0639.

    Refused Conditions Trees 7 docs

In Elmbridge

  • 2026/1934 Granted

    31 Common Road Claygate Esher Surrey KT10 0HG

    Single storey rear extension with alterations to fenestration.

    Received 7 Aug, published by the council 21 Aug 2026 Householder
  • 2026/1131 Granted

    9 Riverside Drive Esher Surrey KT10 8PG

    Part two-storey front extension, new front porch, two-storey rear extension and alterations to fenestration.

    Received 12 May, published by the council 30 Jul 2026 Householder
  • 2026/1856 Granted

    119 Silverdale Avenue Walton-On-Thames Surrey KT12 1EQ

    Two storey side/rear extension, alteration of the single storey rear extension roof, single storey rear outbuilding, side and rear canopy structures to accommodate outdoor kitchen, retention of the existing vehicular access with proposed replacement entrance gates with associated driveway and landscaping works to the front and rear including land level alterations and alterations to fenestration including metal gates and materiality following demolition of existing detached shed structure.

    Received 30 Jul, published by the council 21 Aug 2026 Householder
  • 2026/1442 Granted

    4 Cedar Close East Molesey Surrey KT8 9HR

    Side dormer window, first floor rear and side extension, single storey side extension, detached garage to rear garden following removal of existing prefabricated detached garage, side rooflights and alterations to fenestration.

    Received 15 Jun, published by the council 30 Jul 2026 Householder
  • 2026/1833 Granted

    5A Sassoons Cottages Cottimore Crescent Walton-On-Thames Surrey KT12 2DA

    Single-storey rear infill extension below existing structure and alterations to fenestration.

    Received 28 Jul, published by the council 14 Aug 2026 Householder