Planning application
9 More Lane Esher Surrey KT10 8AJ
Works: Extension Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two-storey front extension, single-storey rear/side extension, partial conversion of garage into living space and alterations to fenestration following partial demolition of existing house.
As published by the council, reference 2022/3727
Application record
- Reference
- 2022/3727
- Type
- Householder Application
- Status
- Final Decision
- Decision
- Granted As published: Grant Planning Permission
- Received
- 12 Dec 2022
- Validated
- 20 Dec 2022
- Decided
- 14 Feb 2023
- Ward
- Esher Ward
- Decision by
- Officer delegated
- Postcode
- KT10 8AJ
Site history
Applications at this address on the Elmbridge register
This site has had 3 applications since 2022: 3 approved, 0 refused.
-
2022/2813 Granted
9 More Lane Esher Surrey KT10 8AJ
Two-storey front extension, part two/part single-storey rear/side extension incorporating garage following partial demolition of existing house.
-
2022/0499 Granted
9 More Lane Esher Surrey KT10 8AJ
Part two/part single-storey rear/side extension incorporating garage following partial demolition of existing house.
Timeline
Dates from the published record
-
12 Dec 2022
Received by Elmbridge
-
20 Dec 2022
Validated
Checked as complete and ready for consideration.
-
14 Feb 2023
Decision issued: Grant Planning Permission
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 14 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About householder applications
Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
9 More Lane Esher Surrey KT10 8AJ
Part two/part single-storey rear/side extension incorporating garage following partial demolition of existing house.
Granted Householder Extension Demolition 38 docsSmall domestic -
9 More Lane Esher Surrey KT10 8AJ
Two-storey front extension, part two/part single-storey rear/side extension incorporating garage following partial demolition of existing house.
Granted Householder Extension Demolition 28 docsSmall domestic -
9 and Site of 11 More Lane Esher Surrey KT10 8AJ
Non-Material Amendments to planning permission 2021/2631 to amend approved roof finish as approved under condition: 3 (Materials Approved) for Plot 2 from Imerys Weathered Brown roof tile, to match approved Eternit Slate roof tile on Plot 1.
Refused Amendments Roofing 3 docs -
9 and Site of 11 More Lane Esher Surrey KT10 8AJ
Confirmation of Compliance with Conditions: 9 (Tree Planting and Maintenance) and 14 (Electric Vehicle Charging Points) of planning permission 2022/1118.
Decided Conditions 6 docs -
9 and 11 More Lane Esher Surrey KT10 8AJ
Non-Material Amendments to planning permission 2020/0231 for minor design alterations to the ground floor rear portions of each of the four plots, a minor increase in floorspace in plot 1A and the installation of a window at the second floor of plot 1A, alteration to the design of the skylight at plots 1A and 2A and removal of monopitch glazed roof on rear extensions of plots 1B and 2B to be replaced with flat roof with two roof lights.
Decided Amendments Extension Loft or dormer +1 20 docs -
9 and Site of 11 More Lane Esher Surrey KT10 8AJ
Variation of Condition: 2 (Approved Plans) of planning permission 2021/2631 (Variation of Condition to amend boundary treatment) to amend roof finish for Plot 2 to Eternit Slate Roof Tile.
Granted Amendments Roofing 6 docs
Other householder applications
In Elmbridge
-
2026/1934 Granted
31 Common Road Claygate Esher Surrey KT10 0HG
Single storey rear extension with alterations to fenestration.
-
2026/1131 Granted
9 Riverside Drive Esher Surrey KT10 8PG
Part two-storey front extension, new front porch, two-storey rear extension and alterations to fenestration.
-
2026/1856 Granted
119 Silverdale Avenue Walton-On-Thames Surrey KT12 1EQ
Two storey side/rear extension, alteration of the single storey rear extension roof, single storey rear outbuilding, side and rear canopy structures to accommodate outdoor kitchen, retention of the existing vehicular access with proposed replacement entrance gates with associated driveway and landscaping works to the front and rear including land level alterations and alterations to fenestration including metal gates and materiality following demolition of existing detached shed structure.
-
2026/1442 Granted
4 Cedar Close East Molesey Surrey KT8 9HR
Side dormer window, first floor rear and side extension, single storey side extension, detached garage to rear garden following removal of existing prefabricated detached garage, side rooflights and alterations to fenestration.
-
2026/1833 Granted
5A Sassoons Cottages Cottimore Crescent Walton-On-Thames Surrey KT12 2DA
Single-storey rear infill extension below existing structure and alterations to fenestration.