Planning application
52-56 High Street Esher Surrey KT10 9QY
Works: New dwelling Several homes
Read from the description, not a valuation. How we read the register
Relates to 2021/3090
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of Condition: 6 (Air quality management area) of planning permission 2021/3090 (Two flats at third-floor level).
As published by the council, reference 2022/3608
Application record
- Reference
- 2022/3608
- Type
- Variation of Condition Under S73
- Status
- Final Decision
- Decision
- Granted As published: Grant Planning Permission
- Received
- 28 Nov 2022
- Validated
- 28 Nov 2022
- Decided
- 16 Jan 2023
- Ward
- Esher Ward
- Decision by
- Officer delegated
- Postcode
- KT10 9QY
Site history
Applications at this address on the Elmbridge register
This site has had 7 applications since 2020: 5 approved, 0 refused.
-
2025/1288 Granted
52-56 High Street Esher Surrey KT10 9QY
Replacement of the existing upper floor front facing windows with black aluminium framed double glazed windows.
-
2024/2584 Withdrawn
52 - 56 High Street Esher Surrey KT10 9QY
Variation of Condition: 3 (Materials) of planning permission 2022/1731 (Variation of Condition) to remove existing windows within the front elevation and replace with double glazed windows with black aluminium frames.
-
2022/1731 Granted
52-56 High Street Esher Surrey KT10 9QY
Variation of Condition 4 (Lift Overrun) of planning permission 2021/3090 (2 Additional flats) to retain lift overrun as built.
-
2021/3090 Granted
52-56 High Street Esher Surrey KT10 9QY
Two additional flats at third-floor level.
-
2020/1223 Split decision
52 - 56 High Street Esher Surrey KT10 9QY
Confirmation of Compliance with Condition 3 (Potential for Land Contamination - Change of Existing Building Use) of planning permission 2020/0737.
-
2020/0737 Granted
52 - 56 High Street Esher Surrey KT10 9QY
Prior Approval Schedule 2, Part 3 Class O: Change of use from Offices (B1a) to Residential (C3).
Timeline
Dates from the published record
-
28 Nov 2022
Received by Elmbridge
-
16 Jan 2023
Decision issued: Grant Planning Permission
-
19 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2021/3090 Granted
52-56 High Street Esher Surrey KT10 9QY
Two additional flats at third-floor level.
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 16 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
52 High Street Esher Surrey KT10 9QY
First and second floor rear extension, front and rear dormer windows and changes to fenestration at ground floor front elevation.
Granted Full applications Extension Loft or dormer +1 27 docs -
52 High Street Esher Surrey KT10 9QY
Confirmation of Compliance with Condition 3 Part b) iii) and Part 3) (Potential for land contamination) of Planning Permission 2020/0824.
Decided Conditions 11 docs -
52 - 56 High Street Esher Surrey KT10 9QY
Confirmation of Compliance with Condition 3 (Potential for Land Contamination - Change of Existing Building Use) of planning permission 2020/0737.
Split decision Conditions 13 docs -
52 High Street Esher Surrey KT10 9QY
25% historically approved · decision due ~16 Dec
Confirmation of Compliance with Condition: 6 (Development in an Air Quality Management Area (AQMA)) of planning permission 2021/3090.
Awaiting decision Conditions 4 docs -
52 High Street Esher Surrey KT10 9QY
Two additional flats at third-floor level.
Withdrawn Full applications New dwelling 24 docs -
52 - 56 High Street Esher Surrey KT10 9QY
Prior Approval Schedule 2, Part 3 Class O: Change of use from Offices (B1a) to Residential (C3).
Granted Prior approval 14 docs
Other amendment applications
In Elmbridge
-
2026/1677 Refused
Laurelwood Cavendish Road Weybridge Surrey KT13 0JY
Variation of Condition 4 (Tree Protection Measures) and 5 (Site Supervision) of planning permission 2025/1959 (Detached two-storey house with attached garage and associated landscaping following demolition of the existing house) to amend Tree Protection Plans and Tree Planting & Hard Surfaces Plan within approved arboricultural report.
-
2026/2363 Awaiting decision
Land off Anyards Road and Copse Road Cobham Surrey KT11 2LH
Non-Material Amendment to planning permission 2025/0373 to revise the landscape plan to remove the trees from the rear gardens of plots 1-8 and replace them within management controlled areas.
-
2026/1471 Granted
15 Chaucer Avenue Weybridge Surrey KT13 0SS
Variation of Condition 2 (Approved Plans) of planning permission 2025/3172 (Single-storey side and rear extension and extended patio following partial demolition of existing house) to relocate patio stairs and extend patio with an additional stepped level and balustrades.
-
2026/2340 Awaiting decision
Weybridge Health Centre 22 Church Street Weybridge Surrey KT13 8DW
Non-Material Amendment to planning permission to 2024/3065 to remove existing wall on part of the western boundary, relocation of bin store and partial reconstruction of the removed wall and to amend the wording of Conditions 8 (Cycle Parking), 15 (SuDS Verification) and 26 (Habitat Management and Maintenance Plan) to specify 'completed development'.
-
2026/2333 Awaiting decision
103 Grange Road West Molesey Surrey KT8 2PR
Removal of Conditions: 5 (Tree Protection Measures) and 6 (Site supervision) of 2024/3083 (Single-storey rear extension, rear dormer window and alterations to fenestration following partial demolition of rear projection) to remove tree conditions based on the findings of the report as the original conditions cannot be complied with.