Planning application
2022/1739
The Moorings 12 Cherry Orchard Gardens West Molesey Surrey KT8 1QY
Proposal
Single-storey rear outbuilding.
As published by the council, reference 2022/1739
Timeline
Dates from the published record
-
1 Jun 2022
Received by Elmbridge
-
2 Nov 2022
Validated
Checked as complete and ready for consideration.
-
24 Mar 2023
Decision issued: Refuse Planning Permission
-
30 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/0316 Granted
41 Cherry Orchard Road West Molesey Surrey KT8 1QZ
Single storey side extension.
-
2026/0094 Granted
23 Cherry Orchard Gardens West Molesey Surrey KT8 1QY
Single-storey rear/side extension.
-
2024/2677 Granted
River Bank, The Holt Hurstfield Road West Molesey Surrey KT8 1QX
Installation of air-source heat pump in rear garden.
-
2022/3769 Granted
429 Hurst Road West Molesey Surrey KT8 1QT
Single-storey rear extension, roof extension incorporating hip to gable extensions and increase in ridgeline, rear dormer windows, front rooflights, part conversion of garage into living space and alterations to fenestration following removal of a chimney stack.
-
2024/1940 Granted
15 Cherry Orchard Road West Molesey Surrey KT8 1QZ
Single storey rear extension and alterations to fenestration following demolition of existing rear conservatory.
-
2024/1826 Granted
20 Hurstfield Road West Molesey Surrey KT8 1QU
Prior Approval Schedule 2, Part 1, Class A: Single-storey rear extension.
Other full applications applications
In Elmbridge
-
2026/1360 Refused
1A Rydens Grove Hersham Walton-On-Thames Surrey KT12 5RX
Detached single-storey building for light industrial use (Class E(g)(iii)) with residential unit (C3) following demolition of existing building (Class E)
-
2025/3161 Granted
22A and 22B High Street Cobham Surrey KT11 3EB
Construction of a second and third floor to create 8 self-contained flats with private amenity space, two-storey rear extension to accommodate access and internal stairs; construction of a single storey rear outbuilding for cycle and refuse/recycle provision; re-provision of parking to the rear and hard/soft landscaping including green roofs.
-
2026/1049 Refused
Ridgemount Devonshire Road Weybridge Surrey KT13 8HB
Installation of new 2 metre (maximum) high east boundary wall with one new 1.9 metre high pedestrial gate and two new 1.9 metre high vehicular gates, following the removal of the existing 1.2 metre high east boundary wall.
-
2026/0079 Granted
Flat 1 3A Bridge Road East Molesey Surrey KT8 9EU
Construction of a third floor self-contained residential flat with an increase in roof ridge height, dormer windows and private amenity space.
-
2026/0911 Granted
49A Church Street Weybridge Surrey KT13 8DG
Replacement of nine single-glazed timber windows with timber effect double-glazed uPVC windows to match the appearance of the existing windows.