Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Molesey Park Road West Molesey Surrey KT8 2LB

Refused Elmbridge 2022/0862 Lawful Development Cert - Proposed

Works: Extension Loft or dormer Windows or glazing

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Hip-to-gable roof extension, rear dormer window and rooflights.

As published by the council, reference 2022/0862

Application record

Reference
2022/0862
Type
Lawful Development Cert - Proposed
Status
Final Decision
Decision
Refuse Lawful Development Certificate
Received
17 Mar 2022
Validated
17 Mar 2022
Decided
10 Jun 2022
Ward
Molesey West Ward
Decision by
Officer delegated
Postcode
KT8 2LB

Site history

Applications at this address on the Elmbridge register

This site has had 3 applications since 2022: 1 approved, 1 refused.

  • 2022/2615 Granted

    5 Molesey Park Road West Molesey Surrey KT8 2LB

    Hip-to-gable roof extension, rear dormer window and rooflights.

    Decided 7 Sep 2022 Lawful development
  • 2022/1851 Withdrawn

    5 Molesey Park Road West Molesey Surrey KT8 2LB

    Hip-to-gable roof extension incorporating rear dormer window and front rooflights.

    Submitted 14 Jun 2022 Lawful development

Timeline

Dates from the published record

  1. 17 Mar 2022

    Received by Elmbridge

  2. 10 Jun 2022

    Decision issued: Refuse Lawful Development Certificate

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this refusal means

Elmbridge refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 5 Molesey Park Road West Molesey Surrey KT8 2LB

    2022/1851 Submitted 14 Jun 2022 0m away

    Hip-to-gable roof extension incorporating rear dormer window and front rooflights.

    Withdrawn Lawful development Extension Loft or dormer +1 7 docs
  • 5 Molesey Park Road West Molesey Surrey KT8 2LB

    2022/2615 Submitted 22 Aug 2022 0m away

    Hip-to-gable roof extension, rear dormer window and rooflights.

    Granted Lawful development Extension Loft or dormer +1 8 docs
  • 9 Molesey Park Road West Molesey Surrey KT8 2LB

    2026/0753 Submitted 30 Mar 2026 15m away

    Construction of a single-storey rear extension, new front porch, alterations to fenestration, removal of front boundary wall and incorporation of front driveway following demolition of the existing garage to create additional garden space.

    Granted Householder Extension Demolition +1 19 docs
    Small domestic
  • 13 Molesey Park Road West Molesey Surrey KT8 2LB

    2021/4074 Submitted 26 Nov 2021 30m away

    Prior Approval Schedule 2, Part 1, Class A: Single-storey rear extension.

    Granted Prior approval Extension 9 docs
    Small domestic
  • 46 Molesey Park Road West Molesey Surrey KT8 2JZ

    2021/4000 Submitted 19 Nov 2021 38m away

    Variation of Condition: 2 (Approved Plans) of planning permission 2018/3812 (Detached house) to increase ridge height of building.

    Refused Amendments New dwelling Roofing 20 docs
  • 12 Molesey Park Road West Molesey Surrey KT8 2LE

    2024/0240 Submitted 31 Jan 2024 41m away

    Hip-to-gable roof extension incorporating rear dormer windows, front rooflights, alterations to fenestration and front porch.

    Granted Lawful development Extension Loft or dormer +1 8 docs
    Small domestic

In Elmbridge

  • 2026/1633 Refused

    41 Ember Lane Esher Surrey KT10 8EA

    Single storey rear extension.

    3 Jul 2026 Lawful development
  • 2026/1461 Refused

    1 Home Farm Close Esher Surrey KT10 9HA

    Outbuilding following removal of existing outbuilding.

    16 Jun 2026 Lawful development
  • 2026/1877 Granted

    21 Manor Walk Weybridge Surrey KT13 8SD

    Single storey side extension following demolition of existing detached outbuilding.

    31 Jul 2026 Lawful development
  • 2026/1739 Granted

    20 Sidney Road Walton-OnThames Surrey KT12 2NA

    Bifold doors to rear following demolition of existing rear bay window.

    16 Jul 2026 Lawful development
  • 2026/1664 Granted

    12 Green Lane Cobham Surrey KT11 2NN

    Enlargement of rear first-floor window.

    7 Jul 2026 Lawful development