Skip to content
PlanIndex Get alerts
Menu

Planning application

20-22 High Street Esher Surrey KT10 9RT

Granted Elmbridge 2022/0647 Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed Building Consent: Internal alterations to foyer area including new flooring, lighting and wall finishes.

As published by the council, reference 2022/0647

Application record

Reference
2022/0647
Type
Listed Building Consent
Status
Final Decision
Decision
Grant Listed Building Consent
Received
28 Feb 2022
Validated
28 Feb 2022
Decided
11 May 2022
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 9RT

Timeline

Dates from the published record

  1. 28 Feb 2022

    Received by Elmbridge

  2. 11 May 2022

    Decision issued: Grant Listed Building Consent

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 11 May 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Stable Lodge 24A High Street Esher Surrey KT10 9RT

    2023/2928 Submitted 25 Oct 2023 21m away

    Prior Approval Schedule 2, Part 20, Class AB: 2 Additional storeys to existing commercial or mixed use premises to create 1 dwelling.

    Refused Prior approval 11 docs
    Domestic
  • Pavement Outside Grafen House 26 High Street Esher Surrey KT10 9RT

    2025/3163 Submitted 28 Nov 2025 29m away

    Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit in association with application for Advertisement Consent 2025/3221.

    Refused Full applications 25 docs
  • Pavement Outside Grafen House 26 High Street Esher Surrey KT10 9RT

    2025/3221 Submitted 28 Nov 2025 29m away

    Advertisement Consent: 2 internally illuminated LCD display screens on street hub in association with application for planning permission 2025/3163.

    Refused Advertising 23 docs
  • 26-32 High Street Esher Surrey KT10 9RT

    2021/3285 Submitted 16 Sep 2021 29m away

    Four-storey side extension comprising Class E (Commercial Business and Service) on ground floor front and Class E(g)(i) (Office) on all upper floors and rear ground floor following demolition of existing buildings at 26-32 High Street.

    Granted Full applications Extension Demolition 52 docs
  • 32 High Street Esher Surrey KT10 9RX

    2022/2544 Submitted 11 Aug 2022 33m away

    Advertisement Consent: 3 non-illuminated fascia signs and 1 non-illuminated projecting sign.

    Granted Advertising 8 docs
  • 26-32 High Street Esher Surrey KT10 9RT

    2024/2520 Submitted 26 Sep 2024 33m away

    Four-storey building comprising 13 residential units on upper floors with self contained entrance unit on ground floor and flexible Class E Use (Commercial, Business and Service) (330 sqm) on ground floor, following demolition of existing buildings.

    Granted Full applications Demolition 74 docs

In Elmbridge

  • 2026/0680 Granted

    8 Yew Tree Cottage Portsmouth Road Esher Surrey KT10 9AL

    Listed Building Consent for the removal of spray foam insulation and repair and re-roofing of the main roof of the property using natural clay pantiles. The existing main roof covering consists of later concrete tiles which are not historically appropriate. The proposal is to remove these and reinstate natural clay pantiles to match the historic roof covering referenced in the listing description and visible on the adjoining cottage. The catslide extension, currently covered with concrete tiles, will not be altered as part of this proposal.

    20 Mar 2026 Heritage and listed buildings
  • 2026/0845 Granted

    The End Cottage Benfleet Hall 23 Green Lane Cobham Surrey KT11 2NN

    Listed Building Consent: Part retrospective application for amendment to 1 no. External door, addition of 3 no. Gas flues at low level and flashing repairs using lead.

    9 Apr 2026 Heritage and listed buildings
  • 2026/0138 Granted

    4 Heath Road Weybridge Surrey KT13 8TB

    Listed Building Consent: Replacement windows, rear dormer window and internal alterations including partial removal of staircase and internal insulation in association with planning permission 2026/0075.

    12 Jan 2026 Heritage and listed buildings
  • 2026/0679 Granted

    Down Farmhouse Cobham Park Road Downside Cobham SurreyKT11 3NE

    Listed Building Consent for repairs to cracks in walls and ceilings.

    19 Mar 2026 Heritage and listed buildings
  • 2025/0271 Decided

    Forge and Myrtle Cottages 28 Esher Green Esher KT10 8AF

    Listed Building Consent: Retention of rear dormer with increase in roof height and increase in height to ground floor extension and lantern rooflight, alteration to connection of dormer to ground floor extension and alterations to fenestration.

    31 Jan 2025 Heritage and listed buildings