Skip to content
PlanIndex Get alerts
Menu

Planning application

57 More Lane Esher Surrey KT10 8AP

Granted Elmbridge 2022/0643 Householder Application

Works: Loft or dormer Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to roof finish and side roof lights.

As published by the council, reference 2022/0643

Application record

Reference
2022/0643
Type
Householder Application
Status
Final Decision
Decision
Grant Planning Permission
Received
28 Feb 2022
Validated
5 Apr 2022
Decided
30 May 2022
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 8AP

Site history

Applications at this address on the Elmbridge register

This site has had 3 applications since 2022: 2 approved, 1 refused.

  • 2022/1880 Granted

    57 More Lane Esher Surrey KT10 8AP

    Single-storey rear extension, enlargement of rear dormer window, conversion of garage into living space and alterations to fenestration following partial demolition of existing house.

    Decided 25 Aug 2022 Householder
  • 2022/0588 Refused

    57 More Lane Esher Surrey KT10 8AP

    Single-storey rear extension, enlargement of rear dormer window, conversion of garage into living space and alterations to fenestration following partial demolition of existing house.

    Decided 30 May 2022 Householder

Timeline

Dates from the published record

  1. 28 Feb 2022

    Received by Elmbridge

  2. 5 Apr 2022

    Validated

    Checked as complete and ready for consideration.

  3. 30 May 2022

    Decision issued: Grant Planning Permission

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 30 May 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 57 More Lane Esher Surrey KT10 8AP

    2022/1880 Submitted 16 Jun 2022 0m away

    Single-storey rear extension, enlargement of rear dormer window, conversion of garage into living space and alterations to fenestration following partial demolition of existing house.

    Granted Householder Extension Loft or dormer +2 19 docs
    Small domestic
  • 57 More Lane Esher Surrey KT10 8AP

    2022/0588 Submitted 23 Feb 2022 0m away

    Single-storey rear extension, enlargement of rear dormer window, conversion of garage into living space and alterations to fenestration following partial demolition of existing house.

    Refused Householder Extension Loft or dormer +2 19 docs
    Small domestic
  • 61 More Lane Esher Surrey KT10 8AR

    2023/0609 Submitted 27 Feb 2023 60m away

    Confirmation of Compliance with Condition 12 Part (Soft landscaping, lighting, drainage & services) of planning permission 2017/0401 allowed at appeal.

    Decided Conditions 8 docs
  • 61-63 More Lane Esher Surrey KT10 8AR

    2026/0418 Submitted 17 Feb 2026 60m away

    25% historically approved · decision due ~14 Apr

    Deed of Variation to planning permission 2017/0401 (Granted under appeal reference: APP/K3605/W/19/3226579), as varied by the Supplemental Deed dated 28 October 2020 under reference 2020/1913; to amend the tenure of Affordable Dwellings from Shared Ownership to Affordable Rent.

    Awaiting decision Conditions 4 docs
  • 61 More Lane Esher Surrey KT10 8AR

    2026/0973 Submitted 27 Apr 2026 60m away

    Tree Preservation Order EL:18/03 - T1 and T2 Oak (Quercus spp.) Tree Heights: Approx. 14 metres Proposed Works Carry out a sympathetic crown reduction to both T1 and T2, reducing all aspects of the crown by approximately 1.5 metres, ensuring the trees are maintained broadly within their current dimensions and natural form. Works to include: Reduction of lateral branches extending towards the adjacent road and residential property to provide appropriate clearance and reduce end weight Selective reduction of over extended limbs to maintain a balanced crown structure Removal of minor deadwood and any crossing or rubbing branches where identified during works Crown rebalancing to address asymmetry, particularly on T1, where there is evidence of a pronounced lean and tip loading on one side All reductions to be undertaken to suitable secondary growth points in accordance with best arboricultural practice Arboricultural Justification The proposed works are considered necessary, proportionate, and in the long term interests of the trees, for the following reasons: Size Management: A light crown reduction of approximately 1.5 metres will maintain the trees within their current spatial envelope without introducing significant pruning stress or altering their natural form. Risk Mitigation: Selective reduction of extended lateral growth will reduce end weight and sail effect, thereby lowering the risk of branch failure during adverse weather conditions. Structural Balance: Rebalancing of the crown, particularly in relation to T1, will address uneven weight distribution caused by a noticeable lean and tip loading, improving overall structural stability. Clearance from Built Environment: Reduction of growth extending towards the road and adjacent property will provide appropriate clearance, reducing the likelihood of physical damage and ongoing management conflicts. Suppression and Crown Condition: Selective pruning will alleviate minor suppression within the crown, improving li

    Split decision Trees 5 docs
  • 60 More Lane Esher Surrey KT10 8AR

    2021/3548 Submitted 11 Oct 2021 80m away

    Front entrance gate and side fence.

    Granted Householder 12 docs
    Small domestic

In Elmbridge

  • 2026/1354 Refused

    35 Meadway Esher Surrey KT10 9HG

    Retrospective application to increase rear boundary fence height from 1.85m to 3.3m.

    5 Jun 2026 Householder
  • 2026/1068 Granted

    55 Foley Road Claygate Esher Surrey KT10 0LU

    Replacement of 2 no. sets of gates with gates and posts, together with associated landscaping works.

    5 May 2026 Householder
  • 2026/1636 Granted

    1 Courtlands Avenue Esher Surrey KT10 9HZ

    Single storey side extension.

    3 Jul 2026 Householder
  • 2026/1428 Refused

    Sandy Cottage Portsmouth Road Esher Surrey KT10 9AW

    Single storey front/side extension.

    15 Jun 2026 Householder
  • 2026/1580 Granted

    19 Alderson Grove Hersham Walton-On-Thames Surrey KT12 5EL

    Single storey rear extension with rooflight.

    26 Jun 2026 Householder