Skip to content
PlanIndex Get alerts
Menu

Planning application

46 Hurst Lane East Molesey Surrey KT8 9EB

Granted Elmbridge 2021/4319 Lawful Development Cert - Proposed

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hip-to-gable roof extension, rear dormer window and alterations to fenestration.

As published by the council, reference 2021/4319

Application record

Reference
2021/4319
Type
Lawful Development Cert - Proposed
Status
Final Decision
Decision
Grant Lawful Development Cert - Proposed
Received
16 Dec 2021
Validated
16 Dec 2021
Decided
10 Feb 2022
Ward
Molesey East Ward
Decision by
Officer delegated
Postcode
KT8 9EB

Timeline

Dates from the published record

  1. 16 Dec 2021

    Received by Elmbridge

  2. 10 Feb 2022

    Decision issued: Grant Lawful Development Cert - Proposed

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • 46 Hurst Lane East Molesey Surrey KT8 9EB

    2022/0678 Submitted 3 Mar 2022 0m away

    Part two/part single-storey side/rear extension, front porch, single-storey rear outbuilding and alterations to fenestration.

    Granted Householder Extension Windows or glazing 38 docs
    Small domestic
  • 46 Hurst Lane East Molesey Surrey KT8 9EB

    2022/0685 Submitted 3 Mar 2022 0m away

    Vehicular access.

    Granted Lawful development 7 docs
  • 42 Hurst Lane East Molesey Surrey KT8 9EB

    2026/1813 Submitted 24 Jul 2026 20m away

    80% historically approved · decision due ~12 Oct

    Front dormer window, part two/part single-storey rear extension, front porch canopy and alteration to fenestration following partial demolition of existing house.

    Awaiting decision Householder Extension Loft or dormer +2 16 docs
    Small domestic
  • 52 Hurst Lane East Molesey Surrey KT8 9EB

    2022/1356 Submitted 29 Apr 2022 24m away

    Part two/part single-storey side/rear extension and single-storey rear outbuilding following demolition of existing rear extension.

    Granted Householder Extension Demolition 13 docs
    Small domestic
  • Fox Cottage Hurst Lane East Molesey Surrey KT8 9EB

    2026/1425 Submitted 15 Jun 2026 36m away

    Confirmation of Compliance with Conditions: 4 (Landscaping scheme) and 5 (Electric vehicle (EV) charging) of planning permission 2023/2989.

    Decided Conditions 8 docs
  • Land Rear of 62 Dennis Road East Molesey Surrey KT8 9ED

    2023/2989 Submitted 2 Nov 2023 52m away

    Detached single-storey house with access from Hurst Lane, bin store and parking following demolition of the existing garage.

    Granted Full applications Demolition 22 docs
    Small domestic

In Elmbridge

  • 2026/1633 Refused

    41 Ember Lane Esher Surrey KT10 8EA

    Single storey rear extension.

    3 Jul 2026 Lawful development
  • 2026/1461 Refused

    1 Home Farm Close Esher Surrey KT10 9HA

    Outbuilding following removal of existing outbuilding.

    16 Jun 2026 Lawful development
  • 2026/1877 Granted

    21 Manor Walk Weybridge Surrey KT13 8SD

    Single storey side extension following demolition of existing detached outbuilding.

    31 Jul 2026 Lawful development
  • 2026/1739 Granted

    20 Sidney Road Walton-OnThames Surrey KT12 2NA

    Bifold doors to rear following demolition of existing rear bay window.

    16 Jul 2026 Lawful development
  • 2026/1664 Granted

    12 Green Lane Cobham Surrey KT11 2NN

    Enlargement of rear first-floor window.

    7 Jul 2026 Lawful development