Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Summer Avenue East Molesey Surrey KT8 9LU

Granted Elmbridge 2021/4299 Lawful Development Cert - Proposed

Works: Loft or dormer Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Rear dormer window following demolition of existing dormer.

As published by the council, reference 2021/4299

Application record

Reference
2021/4299
Type
Lawful Development Cert - Proposed
Status
Final Decision
Decision
Grant Lawful Development Cert - Proposed
Received
15 Dec 2021
Validated
15 Dec 2021
Decided
9 Feb 2022
Ward
Thames Ditton Ward
Decision by
Officer delegated
Postcode
KT8 9LU

Site history

Applications at this address on the Elmbridge register

This site has had 8 applications since 2021: 2 approved, 6 refused.

  • 2022/3022 Refused

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Retrospective application for a single-storey rear outbuilding.

    Decided 30 Nov 2022 Householder
  • 2022/2455 Refused

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Single-storey rear outbuilding.

    Decided 27 Sep 2022 Lawful development
  • 2022/1456 Granted

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Single-storey rear extension.

    Decided 4 Jul 2022 Householder
  • 2022/1223 Refused

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Rear outbuilding.

    Decided 14 Jun 2022 Lawful development
  • 2021/3414 Refused

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Single-storey rear extension.

    Decided 3 May 2022 Householder
  • 2021/3415 Refused

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Rear dormer window.

    Decided 23 Nov 2021 Lawful development
  • 2021/2676 Refused

    7 Summer Avenue East Molesey Surrey KT8 9LU

    Retrospective application for detached outbuilding with terrace above and a shed.

    Decided 30 Mar 2022 Householder

Timeline

Dates from the published record

  1. 15 Dec 2021

    Received by Elmbridge

  2. 9 Feb 2022

    Decision issued: Grant Lawful Development Cert - Proposed

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 9 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Elmbridge

  • 2026/1633 Refused

    41 Ember Lane Esher Surrey KT10 8EA

    Single storey rear extension.

    3 Jul 2026 Lawful development
  • 2026/1461 Refused

    1 Home Farm Close Esher Surrey KT10 9HA

    Outbuilding following removal of existing outbuilding.

    16 Jun 2026 Lawful development
  • 2026/1877 Granted

    21 Manor Walk Weybridge Surrey KT13 8SD

    Single storey side extension following demolition of existing detached outbuilding.

    31 Jul 2026 Lawful development
  • 2026/1739 Granted

    20 Sidney Road Walton-OnThames Surrey KT12 2NA

    Bifold doors to rear following demolition of existing rear bay window.

    16 Jul 2026 Lawful development
  • 2026/1664 Granted

    12 Green Lane Cobham Surrey KT11 2NN

    Enlargement of rear first-floor window.

    7 Jul 2026 Lawful development