Skip to content
PlanIndex Get alerts
Menu

Planning application

Moore Place The Lodge Portsmouth Road Esher Surrey KT10 9LN

Granted Elmbridge 2021/2028 Listed Building Consent

Works: Extension Roofing Small domestic

Read from the description, not a valuation. How we read the register

Relates to 2021/1775

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed Building Consent: Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for planning permission 2021/1775.

As published by the council, reference 2021/2028

Application record

Reference
2021/2028
Type
Listed Building Consent
Status
Final Decision
Decision
Granted As published: Grant Listed Building Consent
Received
17 May 2021
Validated
17 May 2021
Decided
10 Aug 2021
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 9LN

Timeline

Dates from the published record

  1. 17 May 2021

    Received by Elmbridge

  2. 10 Aug 2021

    Decision issued: Grant Listed Building Consent

  3. 6 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2021/1775 Granted

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for Listed Building Consent 2021/2028.

    Decided 10 Aug 2021 Full applications

3 later applications on the register refer to this one:

  • 2026/0395 Withdrawn

    Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    Variation of Condition: 2 (Approved Plans) of Listed Building Consent 2021/2028 (Listed Building Consent: Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for planning permission 2021/1775). The proposed variation application seeks to include hard/soft landscaping works including boundary treatment and access gates, timber pergola structure to accommodate a proposed outdoor kitchen and outdoor Shepherds Hut structure.

    Submitted 17 Feb 2026 Amendments
  • 2026/0389 Withdrawn

    Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    Variation of Condition 2 (Approved Plans) of Planning Application ref: 2021/1775 (Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for Listed Building Consent 2021/2028). The proposed variation application seeks to include hard/soft landscaping works including boundary treatment and access gates, timber pergola structure to accommodate a proposed outdoor kitchen and outdoor Shepherds Hut structure.

    Submitted 16 Feb 2026 Amendments
  • 2021/1775 Granted

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for Listed Building Consent 2021/2028.

    Decided 10 Aug 2021 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 10 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    2024/1885 Submitted 16 Jul 2024 50 yards away

    Entrance gates, boundary fencing and refurbishment of existing fencing.

    Refused Full applications 18 docs
  • Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    2025/1810 Submitted 8 Jul 2025 50 yards away

    Confirmation of Compliance with Condition: 3 (Wiring) of planning permission 2025/0599.

    Decided Conditions 4 docs
  • The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    2021/4095 Submitted 26 Nov 2021 50 yards away

    Confirmation of Compliance with Condition: 3 (Materials Samples) of planning permission 2021/1775.

    Decided Conditions 4 docs
  • The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    2021/4094 Submitted 26 Nov 2021 50 yards away

    Confirmation of Compliance with Condition:5 (Additional Arboricultural Information) of planning permission 2021/1775.

    Decided Conditions 9 docs
  • The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    2021/4090 Submitted 26 Nov 2021 50 yards away

    Confirmation of Compliance with Condition: 6 (Windows and Doors Details) of planning permission 2021/1775.

    Decided Conditions Windows or glazing 10 docs
  • Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    2026/0395 Submitted 17 Feb 2026 50 yards away

    Variation of Condition: 2 (Approved Plans) of Listed Building Consent 2021/2028 (Listed Building Consent: Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for planning permission 2021/1775). The proposed variation application seeks to include hard/soft landscaping works including boundary treatment and access gates, timber pergola structure to accommodate a proposed outdoor kitchen and outdoor Shepherds Hut structure.

    Withdrawn Amendments Extension Roofing 12 docs
    Small domestic

In Elmbridge

  • 2026/1306 Granted

    44 Octagon Road Whiteley Village Hersham Walton-On-Thames Surrey KT12 4EA

    Listed Building Consent: Installation of an Automatic Opening Vent (AOV) smoke ventilation system to the sloping roof of the property in association with application for planning permission 2026/1299.

    Received 1 Jun, published by the council 18 Aug 2026 Heritage and listed buildings
  • 2026/2238 Awaiting decision

    The Old House 4 Heath Road Weybridge Surrey KT13 8TB

    Listed Building Consent: Internal alterations to remove internal staircase connecting first and second floors.

    Received 15 Sep, published by the council 1 Oct 2026 Heritage and listed buildings
  • 2026/2210 Awaiting decision

    30 Spencer Road East Molesey Surrey KT8 0SR

    Listed Building Consent: A single storey, brick ancillary building, with loft, which was a former coach house and is now an artist studio, has suffered water ingress resulting in a failed timber lintel. The proposal is to carry out a like-for-like repair to the timber lintel and to stabilise the brick gable above.

    Received 11 Sep, published by the council 26 Sep 2026 Heritage and listed buildings
  • 2025/2535 Granted

    Mole Cottage 15 Church Street Cobham Surrey KT11 3EG

    Installation of a 500mm diameter Blue Plaque at 2400mm from ground level on side of building to face pavement.

    Received 26 Sep, published by the council 30 Jul 2026 Heritage and listed buildings
  • 2026/2127 Awaiting decision

    Cedar House Mill Road Cobham KT11 3AL

    Listed Building Consent: Retention of works to House B comprising structural strengthening works within the kitchen; the lifting and relaying of ground-floor finishes and installation of underfloor heating within the kitchen, Great Hall and entrance hall; and alterations to the first-floor gallery floor, including a plywood infill at the former stair opening.

    Received 2 Sep, published by the council 15 Sep 2026 Heritage and listed buildings