Skip to content
PlanIndex Get alerts
Menu

Planning application

The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

Granted Elmbridge 2021/1607 Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed Building Consent: Roof repairs and addition of vapour-permeable membrane.

As published by the council, reference 2021/1607

Application record

Reference
2021/1607
Type
Listed Building Consent
Status
Final Decision
Decision
Granted As published: Grant Listed Building Consent
Received
5 May 2021
Validated
5 May 2021
Decided
6 Jul 2021
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 9LN

Site history

Applications at this address on the Elmbridge register

This site has had 6 applications since 2021: 2 approved, 0 refused.

  • 2022/0017 Decided

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Confirmation of Compliance with Condition: 4 (Tree Pre-commencement Meeting Additional Arboricultural Information) of planning permission 2021/1775.

    Decided 21 Feb 2022 Conditions
  • 2021/4095 Decided

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Confirmation of Compliance with Condition: 3 (Materials Samples) of planning permission 2021/1775.

    Decided 14 Jan 2022 Conditions
  • 2021/4094 Decided

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Confirmation of Compliance with Condition:5 (Additional Arboricultural Information) of planning permission 2021/1775.

    Decided 16 Feb 2022 Conditions
  • 2021/4090 Decided

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Confirmation of Compliance with Condition: 6 (Windows and Doors Details) of planning permission 2021/1775.

    Decided 14 Jan 2022 Conditions
  • 2021/1775 Granted

    The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for Listed Building Consent 2021/2028.

    Decided 10 Aug 2021 Full applications

Timeline

Dates from the published record

  1. 5 May 2021

    Received by Elmbridge

  2. 6 Jul 2021

    Decision issued: Grant Listed Building Consent

  3. 22 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 6 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    2024/1885 Submitted 16 Jul 2024 50 yards away

    Entrance gates, boundary fencing and refurbishment of existing fencing.

    Refused Full applications 18 docs
  • Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    2025/1810 Submitted 8 Jul 2025 50 yards away

    Confirmation of Compliance with Condition: 3 (Wiring) of planning permission 2025/0599.

    Decided Conditions 4 docs
  • The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    2021/4095 Submitted 26 Nov 2021 50 yards away

    Confirmation of Compliance with Condition: 3 (Materials Samples) of planning permission 2021/1775.

    Decided Conditions 4 docs
  • The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    2021/4094 Submitted 26 Nov 2021 50 yards away

    Confirmation of Compliance with Condition:5 (Additional Arboricultural Information) of planning permission 2021/1775.

    Decided Conditions 9 docs
  • The Lodge Moore Place Portsmouth Road Esher Surrey KT10 9LN

    2021/4090 Submitted 26 Nov 2021 50 yards away

    Confirmation of Compliance with Condition: 6 (Windows and Doors Details) of planning permission 2021/1775.

    Decided Conditions Windows or glazing 10 docs
  • Moore Place Lodge Portsmouth Road Esher Surrey KT10 9LN

    2026/0395 Submitted 17 Feb 2026 50 yards away

    Variation of Condition: 2 (Approved Plans) of Listed Building Consent 2021/2028 (Listed Building Consent: Single-storey rear extension, replacement roof and internal alterations following removal of existing decking in association with application for planning permission 2021/1775). The proposed variation application seeks to include hard/soft landscaping works including boundary treatment and access gates, timber pergola structure to accommodate a proposed outdoor kitchen and outdoor Shepherds Hut structure.

    Withdrawn Amendments Extension Roofing 12 docs
    Small domestic

In Elmbridge

  • 2026/2238 Awaiting decision

    The Old House 4 Heath Road Weybridge Surrey KT13 8TB

    Listed Building Consent: Internal alterations to remove internal staircase connecting first and second floors.

    Received 15 Sep, published by the council 1 Oct 2026 Heritage and listed buildings
  • 2026/2210 Awaiting decision

    30 Spencer Road East Molesey Surrey KT8 0SR

    Listed Building Consent: A single storey, brick ancillary building, with loft, which was a former coach house and is now an artist studio, has suffered water ingress resulting in a failed timber lintel. The proposal is to carry out a like-for-like repair to the timber lintel and to stabilise the brick gable above.

    Received 11 Sep, published by the council 26 Sep 2026 Heritage and listed buildings
  • 2025/2535 Granted

    Mole Cottage 15 Church Street Cobham Surrey KT11 3EG

    Installation of a 500mm diameter Blue Plaque at 2400mm from ground level on side of building to face pavement.

    Received 26 Sep, published by the council 30 Jul 2026 Heritage and listed buildings
  • 2026/2127 Awaiting decision

    Cedar House Mill Road Cobham KT11 3AL

    Listed Building Consent: Retention of works to House B comprising structural strengthening works within the kitchen; the lifting and relaying of ground-floor finishes and installation of underfloor heating within the kitchen, Great Hall and entrance hall; and alterations to the first-floor gallery floor, including a plywood infill at the former stair opening.

    Received 2 Sep, published by the council 15 Sep 2026 Heritage and listed buildings
  • 2026/2112 Awaiting decision

    United Reformed Church Queens Road Weybridge Surrey KT13 9UX

    Listed Building Consent: Refurbishment of road frontage fencing, pedestrian and vehicle gates.

    Received 1 Sep, published by the council 15 Sep 2026 Heritage and listed buildings