Skip to content
PlanIndex Get alerts
Menu

Planning application

88 Hurst Road East Molesey Surrey KT8 9AH

Granted Elmbridge 2020/0427 Householder Application

Works: Extension Loft or dormer Roofing Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part two/part single-storey front/side extension, single-storey rear extension, first floor front extension, two storey rear extension, increase in ridge height of 1.25m incorporating front and rear dormer windows and alterations to fenestration following partial demolition of existing house.

As published by the council, reference 2020/0427

Application record

Reference
2020/0427
Type
Householder Application
Status
Final Decision
Decision
Granted As published: Grant Permission
Received
18 Feb 2020
Validated
1 May 2020
Decided
10 Sep 2020
Ward
Molesey East Ward
Decision by
Officer delegated
Postcode
KT8 9AH

Site history

Applications at this address on the Elmbridge register

This site has had 8 applications since 2020: 4 approved, 3 refused.

  • 2025/0864 Granted

    88 Hurst Road East Molesey Surrey KT8 9AH

    Deed of Release of planning permission 2021/3926 to remove the Late Review Mechanism for Affordable Housing.

    Decided 29 Oct 2025 Conditions
  • 2024/1916 Refused

    88 Hurst Road East Molesey Surrey KT8 9AH

    Confirmation of Compliance with Conditions: 5 (Personal Flood Plan), 6 (Landscaping), 7 (Cycle Store) and 8 (EV Charging) of planning permission 2022/3428 allowed at appeal.

    Decided 11 Sep 2024 Conditions
  • 2023/0743 Granted

    88 Hurst Road East Molesey Surrey KT8 9AH

    Variation of Conditions: 2 (Approved plans) and (Materials) of planning permission 2021/3926 (Pair of detached two-storey houses) to confirm new siting of House B in relation to the rear boundary and for both houses; alteration to fenestration, solar panels and the inclusion of heat pump acoustic enclosures.

    Decided 23 Jun 2023 Amendments
  • 2022/3428 Refused

    88 Hurst Road East Molesey Surrey KT8 9AH

    Variation of Conditions: 2 (Approved plans) and 3 (Materials) of planning permission 2021/3926 (detached houses) to alter siting of House B resulting in a reduced distance to the rear boundary, an increase in the basement size for House A, and for both houses; alteration to fenestration, solar panels and the inclusion of heat pump acoustic enclosures.

    Decided 8 Mar 2023 Amendments
  • 2022/2197 Refused

    88 Hurst Road East Molesey Surrey KT8 9AH

    Confirmation of Compliance with Conditions: 7 (Tree Pre-commencement Meeting: Additional Arboricultural Information), 8 (Tree Protection Measures: with Pre-commencement Meeting), 9 (Additional Arboricultural Information), 10 (Site Supervision: Additional Arboricultural Information), 12 (Ecological Enhancement Plan) 13 (Construction Environmental Management Plan) and 18 (Construction Management Plan) of planning permission 2021/3926.

    Decided 27 Jan 2023 Conditions
  • 2022/0187 Split decision

    88 Hurst Road East Molesey Surrey KT8 9AH

    Confirmation of Compliance with Conditions: 8 (Landscaping Scheme). 9 (Landscaping Implementation), 12 (Method of Construction Statement), 14 (Trees Pre-commencement Meeting) and 17 (Archaeology Scheme of Working Site of High Archaeological Potential) of planning permission 2018/0254.

    Decided 18 Mar 2022 Conditions
  • 2021/3926 Granted

    88 Hurst Road East Molesey Surrey KT8 9AH

    Pair of detached two-storey houses with associated parking and new access following demolition of existing house.

    Decided 28 Jun 2022 Full applications

Timeline

Dates from the published record

  1. 18 Feb 2020

    Received by Elmbridge

  2. 1 May 2020

    Validated

    Checked as complete and ready for consideration.

  3. 10 Sep 2020

    Decision issued: Grant Permission

  4. 2 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 10 September 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 88 Hurst Road East Molesey Surrey KT8 9AH

    2022/0187 Submitted 21 Jan 2022 50 yards away

    Confirmation of Compliance with Conditions: 8 (Landscaping Scheme). 9 (Landscaping Implementation), 12 (Method of Construction Statement), 14 (Trees Pre-commencement Meeting) and 17 (Archaeology Scheme of Working Site of High Archaeological Potential) of planning permission 2018/0254.

    Split decision Conditions 9 docs
  • Site Of 88 Hurst Road East Molesey Surrey KT8 9AH

    2024/3023 Submitted 21 Nov 2024 50 yards away

    Variation of Conditions: 1 (Approved Plans) 3 (Heat Pump and Acoustic Enclosure serving House A) 5 (Personal Flood Plan) 6 (Hard and Soft Landscaping) 7 (Cycle Storage) 8 (Fast Charge Socket) and 9 (Parking and Turning Areas) of planning permission 2022/3428 (Variation of Conditions) allowed at appeal to change the location of the heat pump and enclosure serving House A and amend the wording of Conditions 5, 6, 7 and 8 so they can be discharged prior to first occupation.

    Refused Amendments 36 docs
  • 88 Hurst Road East Molesey Surrey KT8 9AH

    2022/2197 Submitted 12 Jul 2022 50 yards away

    Confirmation of Compliance with Conditions: 7 (Tree Pre-commencement Meeting: Additional Arboricultural Information), 8 (Tree Protection Measures: with Pre-commencement Meeting), 9 (Additional Arboricultural Information), 10 (Site Supervision: Additional Arboricultural Information), 12 (Ecological Enhancement Plan) 13 (Construction Environmental Management Plan) and 18 (Construction Management Plan) of planning permission 2021/3926.

    Refused Conditions Trees 15 docs
  • Site Of 88 Hurst Road East Molesey Surrey KT8 9AH

    2024/1711 Submitted 28 Jun 2024 50 yards away

    Confirmation of Compliance with Condition 2 (Heat Pump and Acoustic Enclosure - House B) and Condition 3 (Heat Pump and Acoustic Enclosure - House A) of planning permission 2022/3428 allowed at appeal.

    Split decision Conditions 10 docs
  • 88 Hurst Road East Molesey Surrey KT8 9AH

    2021/3926 Submitted 15 Nov 2021 50 yards away

    Pair of detached two-storey houses with associated parking and new access following demolition of existing house.

    Granted Full applications Demolition 71 docs
  • 88 Hurst Road East Molesey Surrey KT8 9AH

    2023/0743 Submitted 10 Mar 2023 50 yards away

    Variation of Conditions: 2 (Approved plans) and (Materials) of planning permission 2021/3926 (Pair of detached two-storey houses) to confirm new siting of House B in relation to the rear boundary and for both houses; alteration to fenestration, solar panels and the inclusion of heat pump acoustic enclosures.

    Granted Amendments Windows or glazing 25 docs

In Elmbridge

  • 2026/1934 Granted

    31 Common Road Claygate Esher Surrey KT10 0HG

    Single storey rear extension with alterations to fenestration.

    Received 7 Aug, published by the council 21 Aug 2026 Householder
  • 2026/1131 Granted

    9 Riverside Drive Esher Surrey KT10 8PG

    Part two-storey front extension, new front porch, two-storey rear extension and alterations to fenestration.

    Received 12 May, published by the council 30 Jul 2026 Householder
  • 2026/1856 Granted

    119 Silverdale Avenue Walton-On-Thames Surrey KT12 1EQ

    Two storey side/rear extension, alteration of the single storey rear extension roof, single storey rear outbuilding, side and rear canopy structures to accommodate outdoor kitchen, retention of the existing vehicular access with proposed replacement entrance gates with associated driveway and landscaping works to the front and rear including land level alterations and alterations to fenestration including metal gates and materiality following demolition of existing detached shed structure.

    Received 30 Jul, published by the council 21 Aug 2026 Householder
  • 2026/1442 Granted

    4 Cedar Close East Molesey Surrey KT8 9HR

    Side dormer window, first floor rear and side extension, single storey side extension, detached garage to rear garden following removal of existing prefabricated detached garage, side rooflights and alterations to fenestration.

    Received 15 Jun, published by the council 30 Jul 2026 Householder
  • 2026/1833 Granted

    5A Sassoons Cottages Cottimore Crescent Walton-On-Thames Surrey KT12 2DA

    Single-storey rear infill extension below existing structure and alterations to fenestration.

    Received 28 Jul, published by the council 14 Aug 2026 Householder