Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Milestone Road Dartford Kent DA2 6DW

Awaiting decision Ebbsfleet Development Corporation 26/01001/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of single-storey front extension and part two/part single storey rear/side extension

As published by the council, reference 26/01001/FUL

Application record

Reference
26/01001/FUL
Type
Full Application
Status
Awaiting decision
Received
25 Aug 2026
Validated
1 Sep 2026
Ward
Stone House
Parish
Stone
Postcode
DA2 6DW

Comment by 23 September 2026

The council is taking comments on this application until then. Have your say on Ebbsfleet Development Corporation's portal.

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Ebbsfleet Development Corporation

  2. 1 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 5 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ebbsfleet Development Corporation took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Ebbsfleet Development Corporation for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 39 Brent Close Dartford Kent DA2 6DD

    21/00859/FUL Submitted 2 Jun 2021 64m away

    Demolition of existing garden room and erection of a detached games room and garden store

    Granted Full applications Demolition 5 docs
  • 39 Brent Close Dartford Kent DA2 6DD

    21/00859/FUL Submitted 2 Jun 2021 64m away

    Demolition of existing garden room and erection of a detached games room and garden store

    Granted Full applications Demolition 5 docs
  • Bus Shelter Outside 11 To 13 London Road Stone Kent

    25/01302/ADV Submitted 14 Nov 2025 74m away

    Replacement of existing double-sided internally illuminated 6-sheet Bus Shelter advertising displays with Double-sided digital displays

    Granted Advertising 9 docs
  • Bus Shelter Outside 11 To 13 London Road Stone Kent

    25/01302/ADV Submitted 14 Nov 2025 74m away

    Replacement of existing double-sided internally illuminated 6-sheet Bus Shelter advertising displays with Double-sided digital displays

    Granted Advertising 9 docs
  • 51 Brent Close Dartford Kent DA2 6DD

    21/00658/PDE Submitted 29 Apr 2021 101m away

    Determination pursuant to Schedule 2, Part 1 (Class A.1 (g) of the Town and Country Planning (General Permitted Development) (England) Order 2015 as to whether prior approval is required for the erection of a single storey rear extension

    Granted Extension 7 docs
    Small domestic
  • Rear Of 82 London Road Stone DA2 6AN

    22/01365/COU Submitted 18 Nov 2022 117m away

    Change of use of ancillary storage buildings associated with 82 London Road to self contained storage facility (Class B8)

    Granted Full applications 9 docs

In Ebbsfleet Development Corporation

  • 26/00785/FUL Granted

    Maypole County Primary School Franklin Road Dartford Kent DA2 7UZ

    Erection of two enclosures around existing air source heat pump (ASHP) controls

    8 Jul 2026 Full applications
  • 26/00789/FUL Refused

    14 Ivy Villas Station Road Greenhithe Kent DA9 9NE

    Erection of a boundary wall

    9 Jul 2026 Full applications
  • 26/00681/FUL Refused

    14 The Crescent Greenhithe Kent DA9 9EP

    Erection of a part two/part single storey side extension

    15 Jun 2026 Full applications
  • 26/01020/FUL Awaiting decision

    233 High Road Wilmington Kent DA2 7BU

    Erection of a single-storey rear extension

    1 Sep 2026 Full applications
  • 26/01015/FUL Awaiting decision

    5 Foxwood Road Bean Kent DA2 8BH

    Erection of a first floor side extension, single storey rear extension and enlarged porch. Change of materials to the roof and walls

    1 Sep 2026 Full applications