Skip to content
PlanIndex Get alerts
Menu

Planning application

6 DONCASTER ROAD, EASTLEIGH, SO50 5QR

Granted Eastleigh PN/25/100008 Prior notification

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior notification for Single storey rear/side extension. Maximum height to top of flat roof 3mtrs and depth 5mtrs

As published by the council, reference PN/25/100008

Application record

Reference
PN/25/100008
Type
Prior notification
Status
Decided Prior Approval Not Required
Decision
Granted As published: Prior Approval Not Required
Received
1 Sep 2025
Validated
1 Sep 2025
Decided
1 Oct 2025
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Decision by
Delegated Decision
Postcode
SO50 5QR

Site history

Applications at this address on the Eastleigh register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • LDC/25/99892 Decided

    6 DONCASTER ROAD, EASTLEIGH, SO50 5QR

    Lawful Development Certificate for a Proposed Use or Development: Proposed single storey side/rear extension

    Decided 29 Aug 2025 Lawful development

Timeline

Dates from the published record

  1. 1 Sep 2025

    Received by Eastleigh

  2. 1 Oct 2025

    Decision issued: Prior Approval Not Required

  3. 26 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Eastleigh granted permission on 1 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 6 DONCASTER ROAD, EASTLEIGH, SO50 5QR

    LDC/25/99892 Submitted 8 Aug 2025 50 yards away

    Lawful Development Certificate for a Proposed Use or Development: Proposed single storey side/rear extension

    Decided Lawful development Extension 5 docs
    Small domestic
  • 59 ARNOLD ROAD, EASTLEIGH, SO50 5AR

    LDC/21/90346 Submitted 14 Apr 2021 50 yards away

    Lawful Development Certificate for a proposed use: Single storey rear extension

    Decided Lawful development Extension 3 docs
    Small domestic
  • 56 ARNOLD ROAD, EASTLEIGH, SO50 5PF

    H/24/98271 Submitted 26 Sep 2024 100 yards away

    Installation of heat pump external unit in garden.

    Refused Householder 11 docs
    Domestic
  • 33 CHESTNUT AVENUE, EASTLEIGH, SO50 5AN

    DC/25/100496 Submitted 24 Nov 2025 150 yards away

    Discharge of conditions 3 (CEMP), 6 (surface water drainage), 11 (water consumption) & 14 (solar panels) of planning permission F/24/96720 for the construction of a 1no. dwelling following the demolition of domestic double garage, with associated amenity space and access off Mansbridge Road.

    Granted Conditions Demolition 7 docs
    Domestic
  • 50 CHESTNUT AVENUE, EASTLEIGH, SO50 5AL

    H/26/101016 Submitted 2 Mar 2026 150 yards away

    Installation of air source heat pump

    Refused Householder 15 docs
    Domestic
  • 44 CHESTNUT AVENUE, EASTLEIGH, SO50 5AL

    H/26/102104 Submitted 15 Sep 2026 150 yards away

    93% historically approved · decision due ~23 Nov

    Demolition of existing single-storey rear extension and erection of a two-storey rear extension with a single-storey side/rear extension, rooflights and associated external alterations

    Awaiting decision Householder Extension Loft or dormer +1 4 docs
    Small domestic

In Eastleigh

  • PN/26/102171 Awaiting decision

    14 ST JOHNS ROAD, EASTLEIGH, SO50 4GU

    Prior Notification: Erection of single storey rear extension following removal of existing conservatory. Depth 5 metres, Maximum height 3.5 metres, eaves height 3 metres.

    Received 23 Sep, published by the council 2 Oct 2026 Prior approval
  • PN/26/102157 Awaiting decision

    220 BOURNEMOUTH ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 3AF

    Prior Notification for the erection of a single storey flat roof rear extension. Depth 4.8 metres, maximum height 3.26 metres, eaves height 2.9 metres.

    Received 22 Sep, published by the council 2 Oct 2026 Prior approval
  • PN/26/101739 Granted

    98 WINCHESTER ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2GJ

    Prior Notification for the creation of 1no. 2-bedroom flat from Class E with the retention of Class E at the ground floor under Schedule 2, Part 3, Class G of the Town and Country Planning (General Permitted Development) Order 2015.

    Received 25 Jun, published by the council 25 Jul 2026 Prior approval
  • PN/26/102040 Awaiting decision

    34 CRANBURY ROAD, EASTLEIGH, SO50 5HA

    Prior Notification for the construction of a single storey rear extension with a flat roof, constructed in materials similar to that of the existing dwellinghouse (depth 6.0m, height at the eaves 3.0 metres, and maximum height 3.0 metres).

    Received 3 Sep, published by the council 17 Sep 2026 Prior approval
  • PN/26/102035 Awaiting decision

    IMPERIAL HOUSE, GRANGE DRIVE, HEDGE END, SOUTHAMPTON, SO30 2AF

    Application for Prior Approval for installation of solar panel array to roof

    Received 2 Sep, published by the council 17 Sep 2026 Prior approval