Skip to content
PlanIndex Get alerts
Menu

Planning application

DC/26/101638

9 OAK LODGE, BRIDGE ROAD, BURSLEDON, SOUTHAMPTON, SO31 8AL

Decided Eastleigh Approval of conditions

Proposal

Discharge of conditions 5 (precautionary working methods statement), 6 (external materials), 7 (nutrient mitigation) & 8 (biodiversity credits) of planning permission F/25/98800 for the construction of one detached two story dwelling

As published by the council, reference DC/26/101638

Timeline

Dates from the published record

  1. 24 Jun 2026

    Received by Eastleigh

  2. 25 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • T/25/100422 Granted

    ARDENCAPLE, BRIDGE ROAD, BURSLEDON, SOUTHAMPTON, SO31 8AH

    1 no. Silver Birch (T2) - Fell to ground level due to decay in lower part of trunk tree has a lean towards garage due to Western Red cedars in front of them and blocking out the light.

    11 Nov 2025 110m away Trees
  • H/26/101134 Granted

    BEAUMONT HOUSE, BRIDGE ROAD, BURSLEDON, SOUTHAMPTON, SO31 8AH

    Formation of vehicular access and dropped kerb to front of property

    23 Mar 2026 110m away Householder
  • T/21/90589 Granted

    10 BRIDGE CLOSE, BURSLEDON, SOUTHAMPTON, SO31 8AN

    1 no. Ash (T1) - Crown lift to remove all lower branches over number 11 Bridge Close up to 4m over the garage and other surroundings with cuts to remain below 100mm diameter.

    14 May 2021 113m away Trees
  • T/21/90745 Granted

    HIGH TREES, LONG LANE, BURSLEDON, SOUTHAMPTON, SO31 8DA

    1 no. Cedar (T1) - Reduce lateral limbs on the north side of the crown by up to 2.5 meters, on the east and west side of the crown by up to 2 meters and reduce the crown to the south by up to 1.5 meters, remove all major deadwood.

    2 Jun 2021 197m away Trees
  • T/26/100840 Granted

    PLOVERFIELD SOUTH, PLOVERFIELD, LONG LANE, BURSLEDON, SOUTHAMPTON, SO31 8DA

    3no. Oak (T1-T3 as specified in previous application (T/20/89093) and 1no. Oak (the fourth oak tree but designated oak in an earlier plan) - reduce by 2m to improve light available in a garden. The garden is not overlooked by any public areas as previously stated following a review by the local tree inspectors. The trees are becoming overpowering in the garden and reduction will improve the gardens aspect and have little impact on the health of the trees. The recommended reduction will maintain the trees to their surroundings. We have consulted Hands in Nature about this work.

    30 Jan 2026 197m away Trees
  • T/26/101616 Decided

    WILLOWBANK, LONG LANE, BURSLEDON, SOUTHAMPTON, SO31 8DA

    1no. Monterey Cypress (T1) - Lateral reduction on east side by approx. 3m. Bifurcated at 2m above ground level with tight fork with included bark. The trunk and crown shape are distorted due to group pressure. Leans and heavily weighted east. Recently exposed on south side due to failed trunk. Trunk and crown shape distorted due to past group pressure. Potential root damage on north/west side due a to recently failed more dominant tree within approx. 7m. The proposed works will mitigate against risk of failure.

    22 Jun 2026 197m away Trees

In Eastleigh

  • DC/26/101676 Decided

    WOOD HAVEN, WINCHESTER ROAD, FAIR OAK, EASTLEIGH, SO50 7HB

    Application for discharge of conditions 15 (energy efficiency); 18 (accessibility standards), 19 (cycle storage) and 20 (refuse storage) of planning permission ref. F/21/91726 for: Erection of 2no. detached dwellings (1 x 4-bedroom and 1 x 3- bedroom) with associated access and parking.

    30 Jun 2026 Conditions
  • DC/26/101436 Decided

    32-34 BOURNEMOUTH ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 3ZL

    Discharge of conditions 3(a) (site investigation) and 3(b) (remedial scheme) of planning permission F/25/99876 (Re-development of site including demolition of existing office building and replacement with a three-storey headquarters office building, together with associated supporting infrastructure, including car parking and hard and soft landscaping (amended description)).

    20 May 2026 Conditions
  • DC/26/101795 Decided

    High Wood Reservoir, Allington Lane, Southampton, SO30 3HQ

    Application for the discharge of conditions 3 (Bird Hazard Management Plan), 4 (Construction Environmental Management Plan), and 5 (Biodiversity Enhancement Scheme) of application F/23/96049 (Installation of Solar Panels to reservoir roof (amended description)) approved on 9th February 2024.

    20 Jul 2026 Conditions
  • DC/26/101558 Decided

    Land at Foxfields, Dodwell Lane, Bursledon, SO31 1AD

    Discharge of conditions. Condition 4 (Biodiversity Enhancements) For approved planning permission F/26/100797 - Retrospective Change of Use of Land from Agricultural to Equestrian and retention of mobile structures for hay barn/feed store and tack room, manure bay. Retention of access track and associated works including hard standing.

    11 Jun 2026 Conditions
  • DC/26/101668 Decided

    Cockpit Farm Barn, Knowle Lane, Horton Heath, Eastleigh, SO50 7DZ

    Application for discharge of Conditions 18 (cycle storage) and 19 (refuse storage) of planning permission F/23/94713, for: Construction of six (6) dwellings, including landscaping, parking and associated works following demolition and site preparation.

    29 Jun 2026 Conditions