Planning application
DC/22/94083
285 WEST END ROAD, WEST END, SOUTHAMPTON, SO18 3BW
Proposal
Discharge of conditions 9 (energy/water consumption), 10 (visibility splays), 11 (cycle/bin storage), 12 (bin storage), 13 (car parking/turning) and 14 (privacy) of planning permission F/20/88246 for erection of 4no three-bed semi-detached dwellings following demolition of existing dwelling
As published by the council, reference DC/22/94083
Timeline
Dates from the published record
-
28 Oct 2022
Received by Eastleigh
-
20 Jan 2023
Validated
Checked as complete and ready for consideration.
-
27 Mar 2023
Decision issued: Discharged
-
28 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
DC/21/91263 Decided
285 WEST END ROAD, WEST END, SOUTHAMPTON, SO18 3BW
Discharge of Condition application for Conditions 3 (CEMP), 4 (Landscaping), 5 (Drainage), 6 (Ecological Enhancements) and 7 (External Materials) for planning permisison F/20/88246 - Erection of 4no. three-bedroom semi-detached dwellings following demolition of existing dwelling
-
T/26/101457 Decided
275 WEST END ROAD, WEST END, SOUTHAMPTON, SO18 3BW
1no. Oak (T2-014) - Reduce side of oak to original pruning points and suitable branch junctions and blend into existing canopy, to reduce risk of failure. Keeping all cuts to small diameter wounds as possible.
-
DC/26/101175 Decided
271 WEST END ROAD, WEST END, SOUTHAMPTON, SO18 3BW
Discharge of Condition. Condition 4 (Arboricultural Method Statement) for approved planning permission H/25/99336-Single storey rear extension and conversion of the existing garage, alterations to fenestration with new fencing and electric gates to existing rear boundary entrance
-
T/26/101665 Decided
THE OAKS, 55 WILDERNESS HEIGHTS, WEST END, SOUTHAMPTON, SO18 3PS
5no. Oak (T1-5) - Reduce entire canopy of 5 x trees by 2-2.5m back to suitable growth points. Reshape as one canopy. Remove 1x low limb over driveway growing towards house (to the South) & 1x low limb growing over garage (to the West). Reason - To maintain the size of canopy adjacent to highway and dwelling.
-
T/26/101605 Decided
37 WILDERNESS HEIGHTS, WEST END, SOUTHAMPTON, SO18 3PS
1no. Sweet Chestnut - Reduce selected lateral branches by up to 1.5m, specifically the branches extending towards roofline, guttering and conservatory area, and those overhanging the neighbouring garden. The branches would be pruned back to suitable growth points, maintaining the natural shape and balance of the crown. No topping, heavy reduction or removal of the tree is proposed. The overhanging branches are contributing to repeated blockage of gutters through leaf, twig and seed debris. This has caused rainwater to overflow from the gutters and run into the conservatory, creating a risk of ongoing water ingress and property damage. Reduction is intended to provide reasonable clearance from the guttering and conservatory roofline, reduce future gutter obstruction, and help prevent further water overflow into the conservatory. The works would also reduce the extent of overhang into the neighbouring garden, help maintain good neighbour relations, and improve light penetration to plants beneath and around the tree.
-
H/25/100111 Granted
56 CHALK HILL, WEST END, SOUTHAMPTON, SO18 3DB
Construction of an outbuilding with flat roof in the rear garden.
Other conditions applications
In Eastleigh
-
DC/26/101676 Decided
WOOD HAVEN, WINCHESTER ROAD, FAIR OAK, EASTLEIGH, SO50 7HB
Application for discharge of conditions 15 (energy efficiency); 18 (accessibility standards), 19 (cycle storage) and 20 (refuse storage) of planning permission ref. F/21/91726 for: Erection of 2no. detached dwellings (1 x 4-bedroom and 1 x 3- bedroom) with associated access and parking.
-
DC/26/101436 Decided
32-34 BOURNEMOUTH ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 3ZL
Discharge of conditions 3(a) (site investigation) and 3(b) (remedial scheme) of planning permission F/25/99876 (Re-development of site including demolition of existing office building and replacement with a three-storey headquarters office building, together with associated supporting infrastructure, including car parking and hard and soft landscaping (amended description)).
-
DC/26/101795 Decided
High Wood Reservoir, Allington Lane, Southampton, SO30 3HQ
Application for the discharge of conditions 3 (Bird Hazard Management Plan), 4 (Construction Environmental Management Plan), and 5 (Biodiversity Enhancement Scheme) of application F/23/96049 (Installation of Solar Panels to reservoir roof (amended description)) approved on 9th February 2024.
-
DC/26/101558 Decided
Land at Foxfields, Dodwell Lane, Bursledon, SO31 1AD
Discharge of conditions. Condition 4 (Biodiversity Enhancements) For approved planning permission F/26/100797 - Retrospective Change of Use of Land from Agricultural to Equestrian and retention of mobile structures for hay barn/feed store and tack room, manure bay. Retention of access track and associated works including hard standing.
-
DC/26/101668 Decided
Cockpit Farm Barn, Knowle Lane, Horton Heath, Eastleigh, SO50 7DZ
Application for discharge of Conditions 18 (cycle storage) and 19 (refuse storage) of planning permission F/23/94713, for: Construction of six (6) dwellings, including landscaping, parking and associated works following demolition and site preparation.