Skip to content
PlanIndex Get alerts
Menu

Planning application

40-48 Hammonds Drive Eastbourne BN23 6PW

Granted Eastbourne 230498 Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of external cladding, replacement of 1no.existing concertina door with a new roller shutter door and decoration of existing windows and doors

As published by the council, reference 230498

Application record

Reference
230498
Type
Planning Permission
Status
Decision Made
Decision
Approved conditionally
Received
19 Jul 2023
Validated
8 Aug 2023
Decided
26 Jul 2023
Decision by
Delegated List
Postcode
BN23 6PW

Timeline

Dates from the published record

  1. 19 Jul 2023

    Received by Eastbourne

  2. 26 Jul 2023

    Decision issued: Approved conditionally

  3. 8 Aug 2023

    Validated

    Checked as complete and ready for consideration.

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Eastbourne

  • 260441 Granted

    Land outside 15 Cornfield Road Eastbourne East Sussex

    Installation of 1 no. Communications Hub with integrated defibrillatorand advertising display (Advertisement Consent 260447)

    21 Aug 2026 Full applications
  • 260442 Granted

    Land outside 96-98 Terminus Road Eastbourne East Sussex

    Installation of 1 no. Communications Hub with integrated defibrillatorand advertising display (Advertisement Consent 260448)

    21 Aug 2026 Full applications
  • 260438 Granted

    Flat 3, Stafford House Southfields Road Eastbourne East Sussex BN21 1BN

    Replace existing single glazed timber sliding sash windows with doubleglazed timber sliding sash windows front elevation

    19 Aug 2026 Full applications
  • 260436 Granted

    7 Redoubt Road Eastbourne East Sussex BN22 7DL

    Change of use from C4 (HMO) to Sui-Generis HMO (8 letting rooms) withalterations to existing garage

    14 Aug 2026 Full applications
  • 260427 Granted

    Davrek Engineering Finmere Road Eastbourne East Sussex BN22 8QL

    Subdivision of unit B to create 2no. units and installation of roller shutter to north elevation

    12 Aug 2026 Full applications