Skip to content
PlanIndex Get alerts
Menu

Planning application

Garden Cottage, Langney Priory Etchingham Road Eastbourne East Sussex BN23 7DT

Granted Eastbourne 230258 Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Remove existing porch area, installation of solar panels, installation of air source heat pump, and internal alterations

As published by the council, reference 230258

Application record

Reference
230258
Type
Planning Permission
Status
Notice of Decision Issued
Decision
Approved conditionally
Received
6 Apr 2023
Validated
17 Apr 2023
Decided
12 Apr 2023
Ward
St Anthonys
Decision by
Delegated List
Postcode
BN23 7DT

Timeline

Dates from the published record

  1. 6 Apr 2023

    Received by Eastbourne

  2. 12 Apr 2023

    Decision issued: Approved conditionally

  3. 17 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  4. 16 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

52 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Eastbourne

  • 260438 Granted

    Flat 3, Stafford House Southfields Road Eastbourne East Sussex BN21 1BN

    Replace existing single glazed timber sliding sash windows with doubleglazed timber sliding sash windows front elevation

    19 Aug 2026 Full applications
  • 260427 Granted

    Davrek Engineering Finmere Road Eastbourne East Sussex BN22 8QL

    Subdivision of unit B to create 2no. units and installation of roller shutter to north elevation

    12 Aug 2026 Full applications
  • 260416 Granted

    28 Pevensey Road Eastbourne East Sussex BN21 3HP

    Installation of aluminium framed structure to the front of the existing commercial unit, with pitched corrugated roof, and metal roller shutter doors

    4 Aug 2026 Full applications
  • 260415 Granted

    Flat 2, Bolsover Court 19 Bolsover Road Eastbourne East Sussex BN20 7JG

    Conversion of external rear storage area to enlarge existing bedroom and replace single-glazed timber sash windows with uPVC sliding sash windows

    4 Aug 2026 Full applications
  • 260405 Granted

    340 Seaside Eastbourne East Sussex BN22 7RJ

    Change of Use from Class E (commerical, business and service) to create 2no. 2 x bedroom ground floor flats Class C3 (dwelling houses)

    30 Jul 2026 Full applications