Planning application
18 Melvill Lane
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of two single-storey extensions to either side of the property in association with the demolition of the existing garage and lean-to extension.
As published by the council, reference 050043
Application record
- Reference
- 050043
- Type
- Planning Permission
- Status
- Notice of Decision Issued
- Decision
- Approved conditionally
- Received
- 25 Jan 2005
- Validated
- 25 Jan 2005
- Decided
- 14 Mar 2005
- Ward
- Ratton
- Decision by
- Delegated List
- Postcode
- BN20 9EA
Timeline
Dates from the published record
-
25 Jan 2005
Received by Eastbourne
-
14 Mar 2005
Decision issued: Approved conditionally
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 Melvill Lane
Proposed two storey extension to side with front and rear dormers and single storey extension to rear.
Granted Full applications Extension Loft or dormer 3 docsSmall domestic -
15 Melvill Lane Eastbourne East Sussex BN20 9EA
Erection of part two storey part 3 storey extension to side/front, single storey rear extension with terrace above
Granted Householder Extension 11 docsSmall domestic -
16 Melvill Lane Eastbourne East Sussex BN20 9EA
Application for details reserved by condition 5 (landscaping) in relation to planning permission 220067 granted on 11/04/2022
Granted Conditions 4 docs -
4 Angus Close Eastbourne East Sussex BN20 9EH
Lawful Development Certificatefor proposed composite cladding to facade, free standing open wooden porch, integral garage conversion, partial demolition of upper ground floor lean to conservatory, replacement of lower ground floor conservatory installation of juliet balcony
Granted Outline Extension Demolition 8 docsSmall domestic -
3 Melvill Lane Eastbourne East Sussex BN20 9EA
This Application relates to works carried out to 3 Melvill Lane underPlanning Permission EB/2012/0596(HH) 12th October 2012. The original plans showed a garage door being retained within the front elevation but it became necessary to brick up the garage in keeping with the rest of the house and others in the area.
Decided Amendments 10 docs -
66 Parkway Eastbourne East Sussex BN20 9DZ
Erection of single storey side extension
Granted Householder Extension 9 docsSmall domestic
Other full applications applications
In Eastbourne
-
260438 Granted
Flat 3, Stafford House Southfields Road Eastbourne East Sussex BN21 1BN
Replace existing single glazed timber sliding sash windows with doubleglazed timber sliding sash windows front elevation
-
260427 Granted
Davrek Engineering Finmere Road Eastbourne East Sussex BN22 8QL
Subdivision of unit B to create 2no. units and installation of roller shutter to north elevation
-
260416 Granted
28 Pevensey Road Eastbourne East Sussex BN21 3HP
Installation of aluminium framed structure to the front of the existing commercial unit, with pitched corrugated roof, and metal roller shutter doors
-
260415 Granted
Flat 2, Bolsover Court 19 Bolsover Road Eastbourne East Sussex BN20 7JG
Conversion of external rear storage area to enlarge existing bedroom and replace single-glazed timber sash windows with uPVC sliding sash windows
-
260405 Granted
340 Seaside Eastbourne East Sussex BN22 7RJ
Change of Use from Class E (commerical, business and service) to create 2no. 2 x bedroom ground floor flats Class C3 (dwelling houses)