Skip to content
PlanIndex Get alerts
Menu

Planning application

Alldays 46 Beatty Road

Granted Eastbourne 040343 Planning Permission

Works: Extension Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of aluminium powder coated shop front and installation ofautomatic sliding door, including brickwork infill to side elevation .

As published by the council, reference 040343

Application record

Reference
040343
Type
Planning Permission
Status
Notice of Decision Issued
Decision
Approved unconditionally
Received
8 Jun 2004
Validated
11 Jun 2004
Decided
26 Jul 2004
Ward
Sovereign
Decision by
Delegated List
Postcode
BN23 6DG

Timeline

Dates from the published record

  1. 8 Jun 2004

    Received by Eastbourne

  2. 11 Jun 2004

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2004

    Decision issued: Approved unconditionally

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Bus Shelter Beatty Road Eastbourne East Sussex

    260202 Submitted 16 Apr 2026 33m away

    Installation of internally illuminated double sided totem bus stop advertisement

    Granted Advertising 9 docs
  • 6 Pound Close Eastbourne East Sussex BN23 6EF

    210706 Submitted 6 Aug 2021 55m away

    Erection of single storey rear extension and single storey side extension

    Decided Outline Extension 6 docs
    Small domestic
  • 1 Jellicoe Close Eastbourne East Sussex BN23 6DD

    260366 Submitted 8 Jul 2026 59m away

    Lawful Development Certificate for proposed garage conversion

    Granted Outline 24 docs
  • 2 Jellicoe Close

    000336 Submitted 17 Jul 2000 95m away

    Erection of 1.8m high timber fence within garden, behind existing hedge.

    Granted Full applications 3 docs
    Small domestic
  • 55 Beatty Road Eastbourne East Sussex BN23 6DA

    250651 Submitted 22 Oct 2025 142m away

    Erection of single storey rear extension and raise roof height of existing garage

    Granted Householder Extension 24 docs
    Small domestic
  • 90 Beatty Road

    000210 Submitted 25 Apr 2000 145m away

    Erection of replacement boundary wall incorporating piers and chain link.

    Granted Full applications 3 docs
    Small domestic

In Eastbourne

  • 260438 Granted

    Flat 3, Stafford House Southfields Road Eastbourne East Sussex BN21 1BN

    Replace existing single glazed timber sliding sash windows with doubleglazed timber sliding sash windows front elevation

    19 Aug 2026 Full applications
  • 260427 Granted

    Davrek Engineering Finmere Road Eastbourne East Sussex BN22 8QL

    Subdivision of unit B to create 2no. units and installation of roller shutter to north elevation

    12 Aug 2026 Full applications
  • 260416 Granted

    28 Pevensey Road Eastbourne East Sussex BN21 3HP

    Installation of aluminium framed structure to the front of the existing commercial unit, with pitched corrugated roof, and metal roller shutter doors

    4 Aug 2026 Full applications
  • 260415 Granted

    Flat 2, Bolsover Court 19 Bolsover Road Eastbourne East Sussex BN20 7JG

    Conversion of external rear storage area to enlarge existing bedroom and replace single-glazed timber sash windows with uPVC sliding sash windows

    4 Aug 2026 Full applications
  • 260405 Granted

    340 Seaside Eastbourne East Sussex BN22 7RJ

    Change of Use from Class E (commerical, business and service) to create 2no. 2 x bedroom ground floor flats Class C3 (dwelling houses)

    30 Jul 2026 Full applications