Planning application
14 Parkway
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two-storey side extension. (Amendment to previously approved scheme EB/2001/0213)
As published by the council, reference 020552
Application record
- Reference
- 020552
- Type
- Planning Permission
- Status
- Notice of Decision Issued
- Decision
- Approved conditionally
- Received
- 15 Oct 2002
- Validated
- 22 Oct 2002
- Decided
- 13 Feb 2003
- Ward
- Ratton
- Decision by
- Planning Committee
- Postcode
- BN20 9DX
Timeline
Dates from the published record
-
15 Oct 2002
Received by Eastbourne
-
22 Oct 2002
Validated
Checked as complete and ready for consideration.
-
13 Feb 2003
Decision issued: Approved conditionally
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Domestic
-
14 Parkway
Enlargement of existing conservatory to rear of property.
Granted Full applications Extension 3 docs -
31 Parkway
Retention of conservatory without complying with condition No.2 of EB /2002/0365.
Granted Full applications Extension 3 docs -
-
-
14 Parkway
Demolition of existing garage and erection of two-storey extension at side of house.
Granted Full applications Extension Demolition 2 docs
Other full applications applications
In Eastbourne
-
260438 Granted
Flat 3, Stafford House Southfields Road Eastbourne East Sussex BN21 1BN
Replace existing single glazed timber sliding sash windows with doubleglazed timber sliding sash windows front elevation
-
260427 Granted
Davrek Engineering Finmere Road Eastbourne East Sussex BN22 8QL
Subdivision of unit B to create 2no. units and installation of roller shutter to north elevation
-
260416 Granted
28 Pevensey Road Eastbourne East Sussex BN21 3HP
Installation of aluminium framed structure to the front of the existing commercial unit, with pitched corrugated roof, and metal roller shutter doors
-
260415 Granted
Flat 2, Bolsover Court 19 Bolsover Road Eastbourne East Sussex BN20 7JG
Conversion of external rear storage area to enlarge existing bedroom and replace single-glazed timber sash windows with uPVC sliding sash windows
-
260405 Granted
340 Seaside Eastbourne East Sussex BN22 7RJ
Change of Use from Class E (commerical, business and service) to create 2no. 2 x bedroom ground floor flats Class C3 (dwelling houses)