Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Market Hill Framlingham Woodbridge Suffolk IP13 9AW

Awaiting decision East Suffolk DC/26/3045/CON Other Consultation

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Consultation - Pavement licence for 3 tables and 12 chairs to the area immediately outside the front of the premises, covering an area of 5mx1.4m. Between the hours of 08:00-17:00 Monday to Sunday.

As published by the council, reference DC/26/3045/CON

Application record

Reference
DC/26/3045/CON
Type
Other Consultation
Status
Awaiting decision
Received
27 Aug 2026
Validated
27 Aug 2026
Ward
Framlingham
Parish
Framlingham
Postcode
IP13 9AW

Timeline

Dates from the published record

  1. 27 Aug 2026

    Received by East Suffolk

  2. 10 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 22 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 17 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Crown Hotel Market Hill Framlingham Woodbridge Suffolk IP13 9AP

    DC/26/3025/CON Submitted 26 Aug 2026 13m away

    98% historically approved · decision due ~21 Oct

    Consultation - Renewal of pavement licence for 4 tables each with 3 chairs at the front of the premises, covering an area of left of the door (when facing premises) 11m in length & 1.5m wide and right of the door 8m in length & 1.5m wide. Between the hours of 07:30-23:00 Monday to Saturday and 8:00 to 18:00 Sunday.

    Awaiting decision Outline 3 docs
  • 29B Market Hill Framlingham Woodbridge Suffolk IP13 9AN

    DC/26/2045/LBC Submitted 3 Jun 2026 36m away

    Listed Building Consent - Replace failing window with conservation window

    Granted Heritage and listed buildings Windows or glazing 14 docs
  • 12 Market Hill Framlingham Woodbridge Suffolk IP13 9AN

    DC/25/3972/TCA Submitted 16 Oct 2025 54m away

    100% historically approved · decision due ~11 Dec

    1no. Cherry (marked on plan) - Fell

    Awaiting decision Trees 2 docs
  • St Michaels Church Church Street Framlingham Suffolk IP13 9BQ

    DC/26/2996/FUL Submitted 24 Aug 2026 96m away

    93% historically approved · decision due ~19 Oct

    Re-surfacing of existing Driveway

    Awaiting decision Full applications 9 docs
  • Fairfield Lodge Fairfield Road Framlingham Woodbridge Suffolk IP13 9LE

    DC/26/2757/TCA Submitted 4 Aug 2026 103m away

    100% historically approved · decision due ~1 Oct

    1no. Ash (marked T1 on plan) - Reduce crown by 30%, Remove deadwood 1no. Conifer (marked T2 on plan) - Remove large dead limb 2no. Conifer(marked T3 & T4 on plan) - Fell

    Awaiting decision Trees 2 docs
  • Double House 2 - 4 Double Street Framlingham Woodbridge Suffolk IP13 9BN

    DC/26/2587/LBC Submitted 21 Jul 2026 103m away

    99% historically approved · decision due ~18 Sep

    Listed Building Consent - Partial collapse to roof requires urgent repair. Re-roof and repair like for like timbers as necessary.

    Awaiting decision Heritage and listed buildings Roofing 21 docs

In East Suffolk

  • DC/26/3197/EIA Awaiting decision

    Part Land South East Of Grimseys Lane Leiston Suffolk

    EIA Screening Opinion - Reservoir Extension to Sizewell Estate

    10 Sep 2026 Outline
  • DC/26/2832/CON Granted

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).

    10 Aug 2026 Outline
  • DC/26/3120/CON Awaiting decision

    Suffolk Water Recycling Transfer And Storage Project Suffolk

    Consultation - Request for Scoping Opinion under Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 13 of The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended in 2017)

    4 Sep 2026 Outline
  • DC/26/2886/CON Granted

    Land At Silverlace Green Benhall Suffolk IP17 1JH

    Consultation - To facilitate a new connection it has become necessary for Eastern Power Networks plc to upgrade the existing pole mounted transformer to 50kVa.

    13 Aug 2026 Outline
  • DC/26/2965/CCC Granted

    Land At Foxburrow Farm Brightwell Suffolk

    County Council Consultation - Retrospective extension to an existing recycling facility for the importation, storage, treatment and recycling of inert waste and storage of building materials, with parking, office, storage facilities and associated infrastructure.

    21 Aug 2026 Outline