Skip to content
PlanIndex Get alerts
Menu

Planning application

Cakes And Ale Caravan Park Abbey Lane Leiston Suffolk IP16 4TE

Awaiting decision East Suffolk DC/26/2943/EIA EIA Screening Opinion

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

EIA Screening Opinion - Reconfiguration of the holiday park to accommodate the siting of 108 new holiday lodges and works to existing visitor and operational service facilities, together with associated infrastructure works including improvements to access and circulation routes, parking, landscaping, drainage, plant and utilities as well as other site infrastructure. Temporary use of site for workers accommodation within the existing and new holiday accommodation

As published by the council, reference DC/26/2943/EIA

Application record

Reference
DC/26/2943/EIA
Type
EIA Screening Opinion
Status
Awaiting decision
Received
19 Aug 2026
Validated
26 Aug 2026
Ward
Aldeburgh And Leiston
Parish
Theberton
Postcode
IP16 4TE

Comment by 18 September 2026

The council is taking comments on this application until then. Have your say on East Suffolk's portal.

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by East Suffolk

  2. 26 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 31 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 54 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

202 applications on PlanIndex · across 59 councils · 93% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Suffolk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

In East Suffolk

  • DC/26/2769/EIA Decided

    Land Off Ringsfield Road Beccles Suffolk

    EIA Screening Opinion - Residential development of up to 270 dwellings, together with public open space, suitable alternative natural greenspace (SANG) and associated infrastructure.

    5 Aug 2026 Outline
  • DC/26/2834/CON Granted

    Land To South Of Railway Line Westerfield Road Ipswich Suffolk

    Consultation - Part discharge of condition 28 of outline planning permission IP/14/00638/OUTFL in relation to the Community Development Strategy and the full details of projects and measures for the pre-occupancy and early occupancy phase.

    10 Aug 2026 Outline
  • DC/26/3025/CON Awaiting decision

    The Crown Hotel Market Hill Framlingham Woodbridge Suffolk IP13 9AP

    Consultation - Renewal of pavement licence for 4 tables each with 3 chairs at the front of the premises, covering an area of left of the door (when facing premises) 11m in length & 1.5m wide and right of the door 8m in length & 1.5m wide. Between the hours of 07:30-23:00 Monday to Saturday and 8:00 to 18:00 Sunday.

    26 Aug 2026 Outline
  • DC/26/3031/CON Awaiting decision

    79 Hamilton Road Felixstowe Suffolk IP11 7BE

    Consultation - Renewal of pavement licence: 6 tables and 12 chairs Area in front of premises - 6m x 3.4m Tables 1 to 4 (located on pavement) - Monday to Sunday 08:00 to 16:00 Tables 5 and 6 (located on Hamilton Road) - Monday to Sunday 10:00 to 16:00

    26 Aug 2026 Outline
  • DC/26/2758/CON Granted

    Garland Park Garland Park Avenue Rendlesham Woodbridge Suffolk

    Consultation - Variation to Advanced Water Infrastructure Networks Limited, to allow it to supply Water and Sewerage services to a site called Garland Park, Woodbridge.

    4 Aug 2026 Outline