Planning application
Bridge Cottage Mill Lane Hasketon Woodbridge Suffolk IP13 6HE
Relates to DC/26/0350/LBC
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Condition No. 3 (iv) of DC/26/0350/LBC - Installation of wood burning stoves, new flue liners into the existing chimneys and formation of a new bathroom within bedroom 3 (inc new partitions) - Confirmation of flue liner, terminal at chimney pot level (existing and proposed)
As published by the council, reference DC/26/2843/DRC
Application record
- Reference
- DC/26/2843/DRC
- Type
- Approval of Details Reserved by Cond.
- Status
- Awaiting decision
- Received
- 10 Aug 2026
- Validated
- 10 Aug 2026
- Ward
- Carlford And Fynn Valley
- Parish
- Hasketon
- Postcode
- IP13 6HE
Site history
Applications at this address on the East Suffolk register
This site has had 3 applications since 2026.
-
DC/26/0349/FUL Awaiting decision
Bridge Cottage Mill Lane Hasketon Woodbridge Suffolk IP13 6HE
Two new outbuildings and minor alterations to main dwelling.
-
DC/26/0350/LBC Awaiting decision
Bridge Cottage Mill Lane Hasketon Woodbridge Suffolk IP13 6HE
Listed Building Consent - Installation of wood burning stoves, new flue liners into the existing chimneys and formation of a new bathroom within bedroom 3 (inc new partitions)
Timeline
Dates from the published record
-
10 Aug 2026
Received by East Suffolk
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 54 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
DC/26/0350/LBC Awaiting decision
Bridge Cottage Mill Lane Hasketon Woodbridge Suffolk IP13 6HE
Listed Building Consent - Installation of wood burning stoves, new flue liners into the existing chimneys and formation of a new bathroom within bedroom 3 (inc new partitions)
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Bridge Cottage Mill Lane Hasketon Woodbridge Suffolk IP13 6HE
92% historically approved · decision due ~27 Apr
Two new outbuildings and minor alterations to main dwelling.
Awaiting decision Full applications 14 docsDomestic -
Bridge Cottage Mill Lane Hasketon Woodbridge Suffolk IP13 6HE
100% historically approved · decision due ~27 Apr
Listed Building Consent - Installation of wood burning stoves, new flue liners into the existing chimneys and formation of a new bathroom within bedroom 3 (inc new partitions)
Awaiting decision Heritage and listed buildings 11 docs -
The Granary Mill Lane Hasketon Suffolk IP13 6HQ
The proposal is for a series of environmental and building fabric improvements, which will reduce energy use and carbon footprint including : Improved insulation to all roofs, which will involve salvaging and re-using existing clay pan-tiles as far as practically possible. Improved insulation to all external walls, including renewing the timber clad areas with new weatherboarding and an insulated renderboard to the non-original brickwork elevations to the North and the East. Replacement of valley roof with flat GRP roof hidden behind parapet to improve maintenance but also allow photo-voltaic panels to be installed in concealed location. Slate effect photo-voltaic roofing tiles to the 'barn' building in the South. Structurally glazed rooflight over first floor landing area to improve natural ventilation and daylight strategy.
Granted Full applications Loft or dormer Windows or glazing 9 docs -
The Granary Mill Lane Hasketon Woodbridge Suffolk IP13 6HQ
92% historically approved · decision due ~28 Apr
Retrospective Application - Construction of a small shed
Awaiting decision Full applications 10 docsSmall domestic
Other condition discharge and variation applications
In East Suffolk
-
DC/26/2035/DRC Split decision
The Old Rectory The Street South Elmham St Margaret Harleston Suffolk IP20 0PJ
Discharge of Condition Nos. 4, 5, 6, 7, 10, 11, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27, 28 and 30 of DC/24/4379/LBC - Listed Building Consent - Partial Demolition, extension and internal reordering, plus conversion and repair of outbuildings - Supporting Statement and Drawings submitted
-
DC/26/2017/DRC Granted
Hand Car Wash Montrose Service Garage London Road Beccles Suffolk NR34 9YU
Discharge of Condition No. 3 of DC/25/3495/FUL - Erection of a two-storey, 66-bed care home for the elderly with associated access, parking, landscaping, and ancillary buildings, following the demolition of existing garages and associated structures - Fuel Tank and Canopy Removal
-
DC/26/3060/DRC Awaiting decision
25 Cotmer Road Lowestoft Suffolk NR33 9PN
Discharge of Condition No. 14 of DC/24/1151/FUL - Sub division of gardens to create 2 plots and construction of 2 detached bungalows with integral garages - Water Calculations
-
DC/26/2904/DRC Granted
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of Condition No. 3 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south - Demolition and Construction Management Strategy
-
DC/26/3028/DRR42 Awaiting decision
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Development Consent Order Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order