Planning application
Mill Cottage Newbourne Road Bucklesham Ipswich Suffolk IP10 0BY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consultation - Installation of a new low-voltage service pole. Excavation of a joint bay over the existing 35 mm2 service cable. Jointing a new section of 35 mm2 service cable to the existing network and terminating it at the new service pole. Re-stringing the existing overhead service crossing the road and reconnecting it to Mill Cottage at the existing service position.
As published by the council, reference DC/26/2220/CON
Application record
- Reference
- DC/26/2220/CON
- Type
- Other Consultation
- Status
- Responded
- Decision
- No Objections
- Received
- 8 Jun 2026
- Validated
- 8 Jun 2026
- Decided
- 23 Jun 2026
- Ward
- Orwell And Villages
- Parish
- Bucklesham
- Decision by
- Delegated Decision
- Postcode
- IP10 0BY
Timeline
Dates from the published record
-
8 Jun 2026
Received by East Suffolk
-
23 Jun 2026
Decision issued: No Objections
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 23 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Sand Filter Building Newbourne Road Bucklesham Suffolk
93% historically approved · decision due ~28 Aug
Change of use and conversion of the redundant Sand Filter Building into a single residential dwelling.
Awaiting decision Full applications 53 docsDomestic -
The Pump House Watermill Road Bucklesham Woodbridge Ipswich Suffolk IP10 0BY
99% historically approved · decision due ~15 Apr
Discharge of Condition Nos. 4, 5 and 7 of DC/24/4357/FUL - Conversion of the former pump house into 1no. dwelling (self-build) - Method Statement, Construction Environmental Management Plan and Construction Management Strategy.
Awaiting decision Conditions New dwelling 7 docsDomestic -
The Pump House Watermill Road Bucklesham Woodbridge Ipswich Suffolk IP10 0BY
Discharge of Condition Nos. 8 and 9 of DC/24/4357/FUL - Conversion of the former pump house into 1no. dwelling (self-build) - Site investigation and Remediation Strategy - Refer to accompanying Phase 2 Site Investigation prepared by Geosphere Environmental.
Granted Conditions New dwelling 7 docsDomestic -
The Pump House Watermill Road Bucklesham Woodbridge Ipswich Suffolk IP10 0BY
99% historically approved · decision due ~30 Sep
Discharge of Condition No. 10 of DC/24/4357/FUL - Conversion of the former pump house into 1 no. dwelling (self-build) - Proposed Planting Scheme
Awaiting decision Conditions New dwelling 4 docsDomestic -
The Pump House Watermill Road Bucklesham Woodbridge Ipswich Suffolk IP10 0BY
Non-material Amendment of DC/24/4357/FUL - Conversion of the former pump house into 1no. dwelling (self-build) - Minor changes to the internal layout including replacement of spiral staircase with traditional staircase, changes to kitchen layout and master bedroom configuration.
Granted Amendments New dwelling 7 docsDomestic -
36 Jackson Road Newbourne Woodbridge Suffolk IP12 4NR
Discharge of Condition Nos. 4, 6, 7, 9 of DC/24/0725/ARM - Approval of Reserved Matters of DC/21/5189/OUT -Erection of a detached dwelling, garage and access - Application to remove all reserved matters so we have a full planning approval - 4. Landscaping scheme 6. Highways Cycle Storage 7. Highways E.V. 9. Highways Visability P.D.
Granted Conditions New dwelling 6 docsDomestic
Other outline applications
In East Suffolk
-
DC/26/3197/EIA Awaiting decision
Part Land South East Of Grimseys Lane Leiston Suffolk
EIA Screening Opinion - Reservoir Extension to Sizewell Estate
-
DC/26/2832/CON Granted
Land To North Of Railway Line Henley Road Ipswich Suffolk
Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).
-
DC/26/3120/CON Awaiting decision
Suffolk Water Recycling Transfer And Storage Project Suffolk
Consultation - Request for Scoping Opinion under Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 13 of The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended in 2017)
-
DC/26/2886/CON Granted
Land At Silverlace Green Benhall Suffolk IP17 1JH
Consultation - To facilitate a new connection it has become necessary for Eastern Power Networks plc to upgrade the existing pole mounted transformer to 50kVa.
-
DC/26/2965/CCC Granted
Land At Foxburrow Farm Brightwell Suffolk
County Council Consultation - Retrospective extension to an existing recycling facility for the importation, storage, treatment and recycling of inert waste and storage of building materials, with parking, office, storage facilities and associated infrastructure.