Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Spexhall Manor Wash Lane Spexhall Halesworth Suffolk IP19 0RE

Granted East Suffolk DC/26/1898/DRC Approval of Details Reserved by Cond.

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition No. 1 (BNG) of DC/25/2952/FUL - Development of dwellinghouse, garage, bridge, vehicular access, landscaping, and other associated works - Biodiversity Gain Plan

As published by the council, reference DC/26/1898/DRC

Application record

Reference
DC/26/1898/DRC
Type
Approval of Details Reserved by Cond.
Status
Permitted
Decision
Granted As published: Application Permitted
Received
22 May 2026
Validated
22 May 2026
Decided
9 Jun 2026
Ward
Halesworth And Blything
Parish
Spexhall
Decision by
Delegated Decision
Postcode
IP19 0RE

Site history

Applications at this address on the East Suffolk register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • DC/26/1062/DRC Granted

    Land At Spexhall Manor Wash Lane Spexhall Halesworth Suffolk IP19 0RE

    Discharge of Condition Nos. 3, 5, 6, 8, 10, 11, 12, 15, 16, and 17 on DC/25/2952/FUL - Development of dwellinghouse, garage, bridge, vehicular access, landscaping, and other associated works - 3 Eaves, ridge height & external materials - 5 Access onto highway - 6 Surface water - 8 Refuse and recycling bins - 10 Cycle storage - 11 EV charging point - 12 Construction Management Plan - 15 Lighting Design Strategy - 16 Ecology Method Statement - 17 Construction Environmental Management Plan

    Decided 5 Jun 2026 Conditions

Timeline

Dates from the published record

  1. 22 May 2026

    Received by East Suffolk

  2. 9 Jun 2026

    Decision issued: Application Permitted

  3. 24 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Studio 35 Architecture Ltd Agent, an architecture practice registered in Norwich

Active · incorporated 2017 · Norwich

120 applications on PlanIndex · across 6 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Suffolk granted permission on 9 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land At Spexhall Manor Wash Lane Spexhall Halesworth Suffolk IP19 0RE

    DC/26/1062/DRC Submitted 18 Mar 2026 6m away

    Discharge of Condition Nos. 3, 5, 6, 8, 10, 11, 12, 15, 16, and 17 on DC/25/2952/FUL - Development of dwellinghouse, garage, bridge, vehicular access, landscaping, and other associated works - 3 Eaves, ridge height & external materials - 5 Access onto highway - 6 Surface water - 8 Refuse and recycling bins - 10 Cycle storage - 11 EV charging point - 12 Construction Management Plan - 15 Lighting Design Strategy - 16 Ecology Method Statement - 17 Construction Environmental Management Plan

    Granted Conditions Roofing 26 docs
    Domestic

In East Suffolk

  • DC/26/1893/DRC Granted

    The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB

    Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan

    Received 21 May, published by the council 24 Jul 2026 Conditions
  • DC/26/2573/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water

    Received 20 Jul, published by the council 27 Jul 2026 Conditions
  • DC/26/2736/DRC Granted

    Land Adj School Road Church Road Ringsfield Suffolk

    Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water

    Received 3 Aug, published by the council 15 Aug 2026 Conditions
  • DC/26/3165/DRC Awaiting decision

    Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT

    Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.

    Received 8 Sep, published by the council 17 Sep 2026 Conditions
  • DC/26/3167/DRC Awaiting decision

    St Michaels Church Church Street Framlingham Suffolk IP13 9BQ

    Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring

    Received 8 Sep, published by the council 17 Sep 2026 Conditions