Skip to content
PlanIndex Get alerts
Menu

Planning application

Part Land Fronting 4 School Close Barnby Suffolk

Granted East Suffolk DC/26/1609/CON Other Consultation

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Consultation - Installation of 9M Wooden Pole

As published by the council, reference DC/26/1609/CON

Application record

Reference
DC/26/1609/CON
Type
Other Consultation
Status
Responded
Decision
Granted As published: No Objections
Received
29 Apr 2026
Validated
29 Apr 2026
Decided
21 May 2026
Ward
Beccles And Worlingham
Parish
Barnby
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by East Suffolk

  2. 21 May 2026

    Decision issued: No Objections

  3. 27 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Suffolk granted permission on 21 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Part Verge Fronting 8 School Meadow Barnby Suffolk

    DC/26/1608/CON Submitted 29 Apr 2026 50 yards away

    Consultation - Installation of 9M Wooden Pole

    Granted Outline 3 docs
  • Oak Tree Cottage Mill Lane Barnby Beccles Suffolk NR34 7PZ

    DC/20/0081/FUL Submitted 10 Jan 2020 100 yards away

    Demolition of existing cottage and formation of a replacement dwelling

    Refused Full applications Demolition 16 docs
    Domestic
  • Land Rear Of 10 Mill Lane Barnby Suffolk

    DC/25/4790/FUL Submitted 10 Dec 2025 200 yards away

    Construction of 3 bedroom dwelling and all associated works.

    Refused Full applications 19 docs
    Domestic
  • Land South East Of The Street Barnby Suffolk

    DC/26/1543/FUL Submitted 23 Apr 2026 250 yards away

    93% historically approved · decision due ~27 Jul

    The erection of 50 residential dwellings, public open space, infrastructure and associated works.

    Awaiting decision Full applications 206 docs
  • Plot Mill Lane Barnby Suffolk NR34 7PX

    DC/21/4275/DRC Submitted 13 Sep 2021 300 yards away

    Discharge of Condition Nos. 3 and 5 of DC/21/0929/FUL - Construction of new dwelling and garaging including materials - details of the proposed access (including the position of any gates to be erected and visibility splays and details of discharge of surface water

    Granted Conditions New dwelling 4 docs
    Domestic
  • Plot Mill Lane Barnby Suffolk NR34 7PX

    DC/21/4613/VOC Submitted 6 Oct 2021 300 yards away

    Variation of Condition 2 of DC/21/0929/FUL - Construction of new dwelling & garaging including materials

    Granted Amendments New dwelling 8 docs
    Domestic

In East Suffolk

  • DC/26/3197/EIA Awaiting decision

    Part Land South East Of Grimseys Lane Leiston Suffolk

    EIA Screening Opinion - Reservoir Extension to Sizewell Estate

    Received 10 Sep, published by the council 17 Sep 2026 Outline
  • DC/26/2832/CON Granted

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).

    Received 10 Aug, published by the council 22 Aug 2026 Outline
  • DC/26/3120/CON Awaiting decision

    Suffolk Water Recycling Transfer And Storage Project Suffolk

    Consultation - Request for Scoping Opinion under Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 13 of The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended in 2017)

    Received 4 Sep, published by the council 10 Sep 2026 Outline
  • DC/26/2886/CON Granted

    Land At Silverlace Green Benhall Suffolk IP17 1JH

    Consultation - To facilitate a new connection it has become necessary for Eastern Power Networks plc to upgrade the existing pole mounted transformer to 50kVa.

    Received 13 Aug, published by the council 22 Aug 2026 Outline
  • DC/26/2965/CCC Granted

    Land At Foxburrow Farm Brightwell Suffolk

    County Council Consultation - Retrospective extension to an existing recycling facility for the importation, storage, treatment and recycling of inert waste and storage of building materials, with parking, office, storage facilities and associated infrastructure.

    Received 21 Aug, published by the council 31 Aug 2026 Outline