Planning application
2 - 6 Central Avenue Ipswich Suffolk IP3 9SL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Temporary change of use of the site from general industrial and storage (Class B2 and B8) to a bus depot/vehicle maintenance facility (Sui generis) until 31 December 2035 to include; Alterations to the existing building including insertion of access doors and ventilation louvres; erection of waste management and air source heat pump enclosures; works including resurfacing the existing site to provide car, van, motorcycle and cycle parking spaces and bus parking spaces; provision of EV charging points; the installation of a hydrogen facility to include the provision of 4 hydrogen refuelling stations with store, 4 chillers, 4 dispensers, compressors and ventilation stacks for hydrogen control system; gantry bus washing facility; other associated infrastructure to include lighting columns and CCTV cameras; fire walls and security fencing.
As published by the council, reference DC/26/1416/CON
Application record
- Reference
- DC/26/1416/CON
- Type
- Other Consultation
- Status
- Responded
- Decision
- Granted As published: No Objections
- Received
- 15 Apr 2026
- Validated
- 15 Apr 2026
- Decided
- 22 Apr 2026
- Ward
- Melton
- Parish
- Melton
- Decision by
- Delegated Decision
- Postcode
- IP3 9SL
Timeline
Dates from the published record
-
15 Apr 2026
Received by East Suffolk
-
22 Apr 2026
Decision issued: No Objections
-
24 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 22 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
2 - 6 Central Avenue Ipswich Suffolk IP3 9SL
Non-material amendment to planning permission IP/24/00405/FUL (Temporary use of the front forecourt as a bus depot (Sui Generis) for a period of up to 24 months; works including the installation of a temporary hydrogen refuelling facility, the erection of a temporary maintenance building and the installation of a 2.4-metre-high boundary fence) involving re-siting of the refuelling control panel within the fenced compound and the replacement of gates with fencing on the east side of the fenced compound to match the remainder of the enclosure.
Granted Amendments 5 docsSmall domestic -
2 - 6 Central Avenue Ipswich Suffolk IP3 9SL
Variation of Condition 1 (discontinuation of use and restoration of land) of planning permission 24/00405/FUL as amended by 26/00217/NMMA (Temporary use of the front forecourt as a bus depot (Sui Generis); works including the installation of a temporary hydrogen refuelling facility, the erection of a temporary maintenance building and the installation of a 2.4-metre-high boundary fence.) to amend the discontinuation of use and restoration date from 5th August 2026 to 5th February 2028.
Granted Amendments 8 docsSmall domestic -
2 - 6 Central Avenue Ipswich Suffolk IP3 9SL
92% historically approved · decision due ~10 Jun
Temporary change of use of the site from general industrial and storage (Class B2 and B8) to a bus depot/vehicle maintenance facility (Sui generis) until 31 December 2035 to include; Alterations to the existing building including insertion of access doors and ventilation louvres; erection of waste management and air source heat pump enclosures; works including resurfacing the existing site to provide car, van, motorcycle and cycle parking spaces and bus parking spaces; provision of EV charging points; the installation of a hydrogen facility to include the provision of 4 hydrogen refuelling stations with store, 4 chillers, 4 dispensers, compressors and ventilation stacks for hydrogen control system; gantry bus washing facility; other associated infrastructure to include lighting columns and CCTV cameras; fire walls and security fencing.
Awaiting decision Full applications 15 docs -
2 - 6 Central Avenue Ipswich Suffolk IP3 9SL
Non-material amendment to planning permission 24/00405/FUL (Temporary use of the front forecourt as a bus depot (Sui Generis) for a period of up to 24 months; works including the installation of a temporary hydrogen refuelling facility, the erection of a temporary maintenance building and the installation of a 2.4-metre-high boundary fence), to remove reference to a 24-month period.
Granted Amendments 3 docsSmall domestic -
2 - 6 Central Avenue Ipswich Suffolk IP3 9SL
Temporary use of the front forecourt as a bus depot (Sui Generis) for a period of up to 24 months; works including the installation of a temporary hydrogen refuelling facility, the erection of a temporary maintenance building and the installation of a 2.4-metre-high boundary fence.
Granted Full applications 15 docsSmall domestic -
1 - 7 Bluestem Road Ipswich Suffolk IP3 9RR
Demolition of existing buildings and erection of a roadside services development with associated changes of use from wholesale distribution/storage (Use class B8/B2) to a petrol filling station with ancillary retail area (Sui Generis), a drive-through restaurant (Use Class A3/A5) and a drive-through coffee shop (Use Class A3/A5).
Refused Full applications Demolition 25 docs
Other outline applications
In East Suffolk
-
DC/26/3197/EIA Awaiting decision
Part Land South East Of Grimseys Lane Leiston Suffolk
EIA Screening Opinion - Reservoir Extension to Sizewell Estate
-
DC/26/2832/CON Granted
Land To North Of Railway Line Henley Road Ipswich Suffolk
Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).
-
DC/26/3120/CON Awaiting decision
Suffolk Water Recycling Transfer And Storage Project Suffolk
Consultation - Request for Scoping Opinion under Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 13 of The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended in 2017)
-
DC/26/2886/CON Granted
Land At Silverlace Green Benhall Suffolk IP17 1JH
Consultation - To facilitate a new connection it has become necessary for Eastern Power Networks plc to upgrade the existing pole mounted transformer to 50kVa.
-
DC/26/2965/CCC Granted
Land At Foxburrow Farm Brightwell Suffolk
County Council Consultation - Retrospective extension to an existing recycling facility for the importation, storage, treatment and recycling of inert waste and storage of building materials, with parking, office, storage facilities and associated infrastructure.