Skip to content
PlanIndex Get alerts
Menu

Archive · East Suffolk · 2025

Planning applications in East Suffolk, September 2025

Page 4 of 4, newest first. Back to the first page for September 2025.

Applications, September 2025

Newest first ยท page 4 of 4

  • DC/25/3418/FUL Granted

    Woodbridge School Burkitt Road Woodbridge Suffolk IP12 4JH

    Installation of solar PV panels at the Seckford Theatre Building

    Submitted 5 Sep 2025 Full applications
  • DC/25/3422/FUL Granted

    Old Vicarage Redisham Corner Redisham Beccles Suffolk NR34 8LX

    Change of Use of rear part (single storey) of the main house to short term holiday rental and family annexe

    Submitted 5 Sep 2025 Full applications
  • DC/25/3417/FUL Granted

    Woodbridge School Burkitt Road Woodbridge Suffolk IP12 4JH

    Installation of solar PV panels to the roof of the Redstone Building

    Submitted 5 Sep 2025 Full applications
  • DC/25/3420/FUL Awaiting decision

    50 Woodrush Road Purdis Farm Ipswich Suffolk IP3 8RD

    Conversion of garage to Beauty Salon, infill of garage door and addition of side door.

    Submitted 5 Sep 2025 Full applications
  • DC/25/3415/LBC Granted

    The Old Rectory Pretty Road Theberton Leiston Suffolk IP16 4RY

    Listed Building Consent - Repairs to defective parts of existing buildings including works to chimney stacks, dormer windows, store roof, gutters, drainage system, timber framed walls

    Submitted 4 Sep 2025 Heritage and listed buildings
  • DC/25/3548/CON Granted

    Swilland Water Tower High Road Swilland Ipswich Suffolk IP6 9LN

    Other Consultation - Installation of replacement antennas and associated ancillary development

    Submitted 4 Sep 2025 Outline
  • DC/25/3400/FUL Granted

    Piper Cottage Alde House Drive Aldeburgh Suffolk IP15 5EE

    To change the material used to roof the Two Bay Garage / Cart Lodge shown on DC/15/2133/VOC drawing 9910/126A.The current roof is clad with cedar shingles which are rapidly deteriorating & beginning to split and become detached. The split occur where they are in contact with the nails that secure them. The nails are corroding, possibly due to coastal conditions or reaction to the cedar.

    Submitted 2 Sep 2025 Full applications
  • DC/25/3400/AME Awaiting decision

    Piper Cottage Alde House Drive Aldeburgh Suffolk IP15 5EE

    Non-Material amendment of DC/15/2133/VOC - Application to vary condition 2 of DC/14/1627/FUL to allow the erection of a garage/cart lodge to the design shown on drawing 9910/126A (to replace cart lodge shown on 9910/01) - Change the material used to roof the two bay garage / cart lodge to BMI Red land Cumbrian Slate imitation tiles.

    Submitted 2 Sep 2025 Amendments
  • DC/25/3378/FUL Granted

    8 Theatre Street Woodbridge Suffolk IP12 4NE

    Construction of detached outbuilding (home office) for use ancillary to the house

    Submitted 1 Sep 2025 Full applications
  • DC/25/3380/FUL Refused

    Croft House Lower Street Great Bealings Woodbridge Suffolk IP13 6NZ

    Conversion of building to 1 no. self-build dwelling.

    Submitted 1 Sep 2025 Full applications
  • DC/25/3387/CON Withdrawn

    Land East Of Abbey Road Leiston Suffolk

    Consultation - Water Licence Variation Notification

    Submitted 1 Sep 2025 Outline
  • DC/25/3383/FUL Granted

    Rushes Point Dunwich Road Blythburgh Halesworth Suffolk IP19 9LY

    Demolish existing conservatory and remove from site. Proposed single story extension to the south/side and east /rear elevation. Storm canopy over front door

    Submitted 1 Sep 2025 Full applications

Other months in 2025

All of 2025