Planning application
FAULD INDUSTRIAL ESTATE FAULD LANE FAULD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single industrial building comprising storage and distribution (Class B2)
As published by the council, reference P/2025/01384
Application record
- Reference
- P/2025/01384
- Type
- Detailed Planning Application
- Status
- Determined
- Decision
- Granted As published: Conditional Approval - Delegated
- Received
- 3 Dec 2025
- Validated
- 18 Dec 2025
- Decided
- 18 May 2026
- Ward
- Dove
- Parish
- Tutbury CP
- Decision by
- Delegated
Site history
Applications at this address on the East Staffordshire register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
P/2026/00730 Awaiting decision
FAULD INDUSTRIAL ESTATE FAULD LANE FAULD
Continued use of existing temporary building in yard area for an anticipated 4 year period
Timeline
Dates from the published record
-
3 Dec 2025
Received by East Staffordshire
-
18 Dec 2025
Validated
Checked as complete and ready for consideration.
-
18 May 2026
Decision issued: Conditional Approval - Delegated
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
PSA PROPERTIES LTD Applicant, registered in Derby
Active · incorporated 2002 · Derby
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Staffordshire granted permission on 18 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Fauld Industrial Estate Fauld Lane Fauld Staffordshire DE13 9HS
Discharge of conditions number 9, 11, 12 parts (1) and (2), 13 and 14 of planning pemrission P/2022/00900 relating to outline application for the erection of buildings to provide Class E:g. B2, & B8 uses including means of access.
Granted Conditions 22 docs -
Land at Fauld Industrial Estate, Fauld Lane Fauld DE13 9HS
Outline application for B1, B2, & B8 uses including means of access
Granted Outline 16 docs -
FAULD INDUSTRIAL ESTATE FAULD LANE FAULD
78% historically approved · decision due ~28 Aug
Continued use of existing temporary building in yard area for an anticipated 4 year period
Awaiting decision Full applications 6 docs -
Units 316, 316B, 316C, 316G and Units 317, 317B, 317C, 317G Fauld Industrial Estate Fauld Lane Fauld DE13 9HS
Internal and external alterations including change of use of Unit 317G to Office (Class B1) and installation of a mezzanine floor
Granted Full applications 12 docs -
Land at Fauld Industrial Estate Fauld Lane Fauld DE13 9HS
Erection of a detached industrial building comprising of 2 units for General Industrial (Class B2)
Granted Full applications 10 docsSeveral homes -
Land at Fauld Industrial Estate Fauld Lane Fauld Staffordshire
Discharge of conditions 3, 4, 5 & 6 of Planning Permission P/2016/00074 relating to erection of a detached industrial building comprising of 2 units for general industrial (B2)
Granted ConditionsSeveral homes
Other full applications
In East Staffordshire
-
P/2026/00701 Granted
10 NORMAN ROAD TUTBURY DE13 9JZ
Change of use from C3 to C2 children care home for up to two children.
-
P/2025/01398 Granted
JOHN TAYLOR HIGH SCHOOL DUNSTALL ROAD BARTON UNDER NEEDWOOD DE13 8AZ
Construction of outdoor artificial sports pitch and cricket strip including 6 no 13m high floodlights, 4.5m high perimeter fencing, installation of modular toilet and changing block, associated groundworks and formation of new pathway
-
P/2026/00895 Granted
ENVIRONMENT AGENCY UTTOXETER DEPOT DERBY ROAD UTTOXETER ST14 5AA
Installation of 1no. air source heat pump with associated base
-
P/2026/00633 Refused
LAND ADJACENT TO 67 HOPLEY ROAD ANSLOW DE13 9PZ
Erection of a detached dwelling
-
P/2026/00913 Granted
ROEBUCK INN TOBYS HILL DRAYCOTT IN THE CLAY DE6 5BT
Removal and relocation of the existing liquefied petroleum gas storage tank with associated 1.8m high fencing, gates & fire wall, 0.9m bollards and car park alterations