Skip to content
PlanIndex Get alerts
Menu

Planning application

63 Burton Road Branston Staffordshire DE14 3DW

Granted East Staffordshire P/2021/00660 Prior Notification - Householder

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior Notification for the erection of a single storey rear extension, 4m from the original rear wall, 2.9m to the highest point of the roof and 2.7m to the eaves

As published by the council, reference P/2021/00660

Application record

Reference
P/2021/00660
Type
Prior Notification - Householder
Status
Determined
Decision
Granted As published: Prior Approval Not Required
Received
6 May 2021
Validated
13 May 2021
Decided
16 Jun 2021
Ward
Branston
Parish
Branston
Decision by
Delegated
Postcode
DE14 3DW

Timeline

Dates from the published record

  1. 6 May 2021

    Received by East Staffordshire

  2. 13 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 16 Jun 2021

    Decision issued: Prior Approval Not Required

  4. 2 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Stephen Capper Design And Planning Agent, a planning consultancy

65 applications on PlanIndex · across 9 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Staffordshire granted permission on 16 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 57 Burton Road Branston Staffordshire DE14 3DW

    P/2015/01129 Submitted 5 Aug 2015 50 yards away

    Retention of a detached storage building

    Granted Householder 6 docs
    Domestic
  • 52 Burton Road BRANSTON DE14 3DN

    P/2016/01636 Submitted 10 Nov 2016 50 yards away

    Erection of part two storey, part first floor, part single storey rear and side extensions

    Granted Householder Extension 24 docs
    Small domestic
  • 42 BURTON ROAD BRANSTON DE14 3DN

    P/2025/01331 Submitted 6 Oct 2025 100 yards away

    Demolition of existing conservatory and garage to facilitate the erection of a single storey rear extension including roof lantern and installation of glass balustrade with side screening, erection of a part two storey, part single storey side extension, alterations to existing porch roof to form a pitched roof, alterations to fenestrations on front and rear elevations and rendering to front and rear elevations

    Granted Householder Extension Roofing +2 9 docs
    Small domestic
  • 66 Burton Road Branston Staffordshire DE14 3DN

    P/2017/00414 Submitted 29 Mar 2017 100 yards away

    Prior Notification for the erection of a single storey rear extension, 6m from the original rear wall, 4m to the highest point of the roof and 3m to the eaves

    Granted Prior approval Extension 5 docs
    Small domestic
  • 36 Burton Road Branston Staffordshire DE14 3DN

    P/2018/00354 Submitted 12 Mar 2018 100 yards away

    Erection of a single storey rear extension

    Granted Householder Extension 6 docs
    Small domestic
  • 43 Burton Road Branston Staffordshire DE14 3DL

    P/2025/00890 Submitted 22 Aug 2025 100 yards away

    Change of use from a Class C3 dwelling to a Class C2 childrens care home for up to three children with two carers as well as the removal of the front boundary wall and widening of the existing dropped kerb. (amended description and additional plans)

    Granted Full applications 15 docs
    Small domestic

In East Staffordshire

  • P/2026/01018 Awaiting decision

    DAISY BANK FARM THORNEY LANES HOLT HILL NEWBOROUGH DE13 8RY

    Prior notification for the demolition of modern farm buildings, steel portal framed building(s), Dutch barn and lean to structures.

    Received 29 Sep, published by the council 7 Oct 2026 Prior approval
  • P/2026/00904 Granted

    WYLTRA 4 BANK CLOSE UTTOXETER ST14 8BP

    Prior Notification for the erection of a single storey rear extension 4.00 metres from the original rear wall, 3.00 metres to the highest point of the roof and 3.00 metres to the eaves

    Received 21 Aug, published by the council 26 Aug 2026 Prior approval
  • P/2026/00966 Granted

    CARLTON MANOR STRAMSHALL ROAD SPATH STRAMSHALL ST14 5AD

    Prior Notification for excavation works to form an Irrigation Pond

    Received 9 Sep, published by the council 25 Sep 2026 Prior approval
  • P/2026/00848 Granted

    HOLLAND AND BARRETT DIRECT VITALITY HOUSE SIXTH AVENUE BURTON UPON TRENT DE14 2WP

    Prior Approval for the installation of a solar PV system (totalling 1000kWp) on the South-west and North-east facing roof slopes.

    Received 29 Jul, published by the council 7 Aug 2026 Prior approval
  • P/2026/00684 Granted

    BARN AT MINKS FARM BRAKENHURST ROAD BURTON UPON TRENT DE13 8RQ

    Prior approval for the conversion of agricultural buildings to form one dwelling and ancillary store building

    Received 22 Jun, published by the council 22 Jul 2026 Prior approval