Planning application
32 Eton Close Burton Upon Trent Staffordshire DE14 2SU
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Notification for the erection of a single storey rear extension, 4m from the original rear wall, 3.55 m to the highest point of the roof and 2.250m to the eaves
As published by the council, reference P/2018/01532
Application record
- Reference
- P/2018/01532
- Type
- Prior Notification - Householder
- Status
- FINAL DECISION
- Decision
- Prior Approval Not Required
- Received
- 30 Nov 2018
- Validated
- 7 Dec 2018
- Decided
- 7 Jan 2019
- Ward
- Eton Park
- Parish
- Horninglow and Eton
- Decision by
- Delegated
- Postcode
- DE14 2SU
Timeline
Dates from the published record
-
30 Nov 2018
Received by East Staffordshire
-
7 Dec 2018
Validated
Checked as complete and ready for consideration.
-
7 Jan 2019
Decision issued: Prior Approval Not Required
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
26 Eton Close Burton upon Trent Staffordshire DE14 2SU
Erection of a single storey rear extension
Granted Householder Extension 10 docsSmall domestic -
2 A Eton Road Burton upon Trent DE14 2SW
Retention of single storey side and rear extension and alterations to the roof to form front porch
Granted Householder Extension 31 docsSmall domestic -
2A Eton Road Burton Upon Trent DE14 2SW
Erection of a single storey rear and side extension and raising of the eaves height to the rear to facilitate loft conversion, including the installation of rooflights to the front and rear roofslopes, and alterations to the roof to form front porch (Amended scheme)
Granted Householder Extension Loft or dormer 13 docsSmall domestic -
2A Eton Road Burton Upon Trent Staffordshire DE14 2SW
Erection of a single storey rear and side extension and raising of the eaves height to the rear to facilitate loft conversion, including the installation of rooflights to the front and rear roofslopes, and alterations to the roof to form front porch (Amended Description and Plans received 10.03.2016)
Granted Householder Extension Loft or dormer 22 docsSmall domestic -
206 Derby Road Burton upon Trent Staffordshire DE14 1RN
Erection of a single storey rear extension
Refused Householder Extension 7 docsSmall domestic -
Unit 2 & Associated Land Maltings Industrial Estate Derby Road Burton upon Trent Staffordshire DE14 1RN
Display of a non-illuminated double sided free standing sign
Granted Advertising 5 docs
Other prior approval applications
In East Staffordshire
-
P/2026/00904 Decided
WYLTRA 4 BANK CLOSE UTTOXETER ST14 8BP
Prior Notification for the erection of a single storey rear extension 4.00 metres from the original rear wall, 3.00 metres to the highest point of the roof and 3.00 metres to the eaves
-
P/2026/00794 Granted
355 STANTON ROAD STAPENHILL BURTON UPON TRENT DE15 9SF
Prior Notification for the erection of a single storey rear extension 4.50 metres from the original rear wall, 2.80 metres to the highest point of the roof and 2.80 metres to the eaves
-
P/2026/00897 Decided
76 DEMONTFORT WAY UTTOXETER ST14 8XY
Prior Notification for the erection of a single storey rear extension 4.50 metres from the original rear wall, 2.80 metres to the top of the roof, 3.5 metres to the top of the roof lantern and 2.80 metres to the eaves
-
P/2026/00910 Decided
BIRCHWOOD COTTAGE BIRCHWOOD PARK FRADSWELL ST18 0EZ
Prior Approval for the conversion of an agricultural building to form one dwelling.
-
P/2026/00804 Granted
SHAWCROFT FARM ELLASTONE ROAD WOOTTON DE6 2GW
Prior notification for the erection of an extension to an agricultural building for storage of straw.