Planning application
Golding Skip Hire Nicolson Way Burton Upon Trent Staffordshire DE14 2AW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of single storey extensions to existing office building.
As published by the council, reference P/2018/01460
Application record
- Reference
- P/2018/01460
- Type
- Detailed Planning Application
- Status
- FINAL DECISION
- Decision
- Conditional Approval - Delegated
- Received
- 15 Nov 2018
- Validated
- 7 Dec 2018
- Decided
- 11 Feb 2019
- Ward
- Shobnall
- Parish
- Shobnall
- Decision by
- Delegated
- Postcode
- DE14 2AW
Timeline
Dates from the published record
-
15 Nov 2018
Received by East Staffordshire
-
7 Dec 2018
Validated
Checked as complete and ready for consideration.
-
11 Feb 2019
Decision issued: Conditional Approval - Delegated
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
G D Golding Skip Hire And Haulage Nicolson Way Burton Upon Trent Staffordshire DE14 2AW
Variation of Condition 1 of ES 11/04/505 W to allow for a revised site layout
Granted Other -
G D Golding Skip Hire And Haulage Nicolson Way Burton Upon Trent Staffordshire DE14 2AW
Change of use of land from Class B2 to Sui Generis in order to extend eastwards
Granted Other -
T Bates Plant Hire Ltd Nicolson Way Burton Upon Trent DE14 2AW
Raise the ridge height of the existing building, removal of existing on site cabins and erection of a two storey office side extension to form offices, workshop and storage areas and a rear extension for the compressor house, formation of a new vehicular access and installation of a 2.1 metre high gate.
Granted Full applications Extension Roofing 13 docs -
T Bates Plant Hire Ltd Nicolson Way Burton upon Trent DE14 2AW
Erection of two storey side extension, single storey rear extension, removal of existing on-site cabins, erection of 2 metre high gate and formation of new vehicular access
Withdrawn Full applications Extension 11 docsSmall domestic -
Premier Self Store Nicolson Way Burton Upon Trent DE14 2AW
Display of an externally illuminated 'V' style totem sign
Granted Advertising 9 docs -
Premier Removals Nicolson Way Burton Upon Trent DE14 2AW
Felling of 6 Cherry trees and 2 Ash trees (G1 TPO 122)
Granted Trees 7 docs
Other full applications applications
In East Staffordshire
-
P/2026/00133 Granted
Land off Yoxall Road Morrey Burton upon Trent DE13 8PE
Demolition of an agricultural building to facilitate the erection of a single storey dwelling house, formation of an access drive and associated parking.
-
P/2026/00759 Granted
80 HALL ROAD ROLLESTON ON DOVE DE13 9BY
Change of use of existing detached domestic garage to form a beauty business with associated external alterations
-
P/2026/00720 Granted
LAST ROSE COTTAGE MOORES COTTAGE FARM SLACK LANE MAYFIELD DE6 2JX
Conversion of two existing residential units into a single dwelling house, including formation of an internal doorway and removal of a secondary kitchen.
-
P/2026/00664 Refused
38 CAERNARVON CLOSE STRETTON DE13 0ET
Erection of a 1 x 2 bedroom bungalow
-
P/2025/00829 Granted
Lower Farm Lees Lane Dodsleigh Staffordshire ST10 4QA
Conversion of an agricultural building into two dwellings with associated external alterations including new internal balconies and formation of new access onto Dodsleigh Lane.