Planning application

Land at Green Lane Marchington Staffordshire

Granted East Staffordshire P/2017/01479 Planning Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 for the construction of a Solar Farm with ancillary development including solar panels and frames, sub-station, comms building, inverter cabins, switchgear housing, security fencing and security cameras without complying with Condition 8 of planning permission P/2015/00791 relating to the photovoltaic arrays and associated cabinets to be removed from the site following any 6 month period of non-operation or immediately following the expiration of 30 years from the date of first export of electricity on 30th March 2047 whichever is the sooner

As published by the council, reference P/2017/01479

Application record

Reference
P/2017/01479
Type
Planning Condition
Status
FINAL DECISION
Decision
Conditional Approval - Delegated
Received
15 Nov 2017
Validated
28 Nov 2017
Decided
8 Feb 2018
Ward
Crown
Parish
Marchington
Decision by
Delegated

Timeline

Dates from the published record

  1. 15 Nov 2017

    Received by East Staffordshire

  2. 28 Nov 2017

    Validated

    Checked as complete and ready for consideration.

  3. 8 Feb 2018

    Decision issued: Conditional Approval - Delegated

  4. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • Land at Green Lane Marchington Staffordshire

    P/2017/00785 Submitted 21 Jun 2017 0m away

    Discharge of condition no 9 of planning permission P/2015/00791 relating to the Construction of a Solar Farm with ancillary development including solar panels and frames, sub-station, comms building, inverter cabins, switchgear housing, security fencing and security cameras

    Granted Conditions
  • Land at Green Lane Marchington Staffordshire

    P/2017/00665 Submitted 26 May 2017 0m away

    Construction of a Solar Farm with ancillary development including solar panels and frames, sub-station, comms building, inverter cabins, switchgear housing, security fencing and security cameras (Non-Material Amendment relating to P/2015/00791 for the reduction in number and size of solar panels and area included within the fence, reduction in number of inverter cabins and CCTV cameras, change from Balancing Equipment container to storage container and 2 Comms building and 1 switchgear enclosure to 1 Substation Housing, reduction in footprint of substation and inverter cabin, reduction in pole height of CCTV by 0.6m and siting of satellite dish)

    Granted Amendments 16 docs
    Small domestic
  • Land At Green Lane Marchington Staffordshire

    P/2015/01310 Submitted 14 Sep 2015 0m away

    Erection of a standby electricity generation plant & associated communications and welfare building, fuel tanks, control building, substation and acoustic fencing

    Refused Full applications 28 docs
  • St Peters Church Church Lane Marchington Staffordshire ST14 8LJ

    P/2021/00800 Submitted 8 Jun 2021 426m away

    Remove 2 branches overhanging neighbouring property (T3) and reduce lowest limb over garden back to branch growing east (T4) from 2 Ash trees of TPO 421 (Revised Description)

    Granted Trees 6 docs
  • St Peters Church Church Lane Marchington Staffordshire ST14 8LJ

    P/2021/00818 Submitted 8 Jun 2021 426m away

    Removal of damaged horizontal branch to cherry tree (C1) and remove weakest trunk of a double trunked conifer (C2)

    Granted Trees 11 docs
  • Land at Green Lane Marchington Staffordshire

    P/2015/01681 Submitted 8 Dec 2015 439m away

    Discharge of conditions 3 - 6 of planning permission P/2015/00791 relating to the construction of a Solar Farm with ancillary development including solar panels and frames, sub-station, comms building, inverter cabins, switchgear housing, security fencing and security cameras

    Granted Conditions

In East Staffordshire

  • P/2026/00608 Granted

    LAND TO THE WEST OF UTTOXETER A50 BYPASS UTTOXETER

    Details required by condition 2 (surface water drainage interceptor) of planning permission P/2021/01577 relating to application under Section 73 of the Town and Country Planning Act 1990 for the erection of 450 dwellings and garages including 121 affordable units, together with drainage and highways infrastructure, and including details of access, appearance, landscaping, layout and scale (Phase 2) without complying with 1 of planning permission P/2020/01488 dated 16th April 2021 relating to amendments to the approved plans to house types on Phase 2C, substitution of the Site Layout, Materials Plan, Boundary Treatment Plan, Developable Areas and Electric Vehicle Charging Layout in respect of Phase 2A-2E.

    29 May 2026 Conditions
  • P/2026/00627 Granted

    PREMIER INN MERCIA PARK BURTON UPON TRENT DE14 2DQ

    Details required by conditions 10 (swift & bat provision) and 13 (EV charging) of planning permission P/2024/00742 relating to demolition of existing hotel restaurant and replacement with an attached four storey new building providing an additional 48 bedrooms and reconfigured to provide a breakfast room, together with alterations to the car park and all associated works.

    4 Jun 2026 Conditions
  • P/2026/00923 Decided

    LAND SOUTH OF LICHFIELD ROAD BRANSTON

    Details required by condition 5 (remediation scheme) on Plots 11, 12, 13 and 14 of planning permission P/2024/00280 relating to the application under Section 73 to vary Condition 1 (plans) attached to the Reserved Matters application P/2023/00666 for the erection of 100 dwellings including details of appearance, landscaping, layout and scale (Phase 5 - Miller Homes Ltd)

    26 Aug 2026 Conditions
  • P/2026/00649 Granted

    LOWER CASTLE HAYES FARM BELMOT ROAD NEEDWOOD DE13 9PH

    Discharge of conditions number 5 of planning permission P/2024/01373 relating to the farmhouse - replacement of six windows (window 3) to the North elevation on the second floor and replacement of cement render to the West elevation.

    15 Jun 2026 Conditions
  • P/2026/00621 Granted

    90 HORNINGLOW ROAD BURTON UPON TRENT DE14 2PT

    Details required by conditions 3 (drainage), 4 (contamination report), 5 (noise impact assessment) and 14 (bat & swift boxes) of planning permission P/2025/00848 relating to conversion of barn to form 2 no. residential dwellings (Class C3).

    2 Jun 2026 Conditions