Planning application
Land North Of Hornsea Road Skipsea East Riding Of Yorkshire YO25 8ST
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Requirement 18 (Written Scheme of Investigation) for Phase C at the Onshore Substation Zone of DCO granted by SoS for Dogger Bank South offshore wind farm and onshore works - Planning Inspectorates ref: EN010125
As published by the council, reference 26/01821/NSREQ
Application record
- Reference
- 26/01821/NSREQ
- Type
- NSIP requirement
- Status
- Application Approved
- Decision
- Approve
- Received
- 14 Jul 2026
- Validated
- 16 Jul 2026
- Decided
- 13 Aug 2026
- Ward
- East Wolds And Coastal
- Parish
- Skipsea Parish Council
- Decision by
- Delegated Decision
- Postcode
- YO25 8ST
Timeline
Dates from the published record
-
14 Jul 2026
Received by East Riding of Yorkshire
-
16 Jul 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
13 Aug 2026
Decision issued: Approve
-
13 Aug 2026
Status changed to Pending Decision
Previously Pending Consideration.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Riding of Yorkshire granted permission on 13 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on East Riding of Yorkshire's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Land South Of Butt Farm Victoria Road Beverley East Riding Of Yorkshire HU17 8PJ
Discharge of Requirements 15 (Highway Access Plan - Phase A), 18 (Written Scheme of Investigation - Phases A & B), 24 (Public Rights of Way Management Plan - Phase A) and 36 (Permanent Access Road Design - Phase A) for Phase A works (Enabling Works, Permanent Access Road, Compounds) and Phase B works (Onshore Converter Stations) of DOC granted by SoS for Dogger Bank offshore wind farm and onshore works - Planning Inspectorates ref: EN010125
Granted 11 docs