Planning application
Land At Neat Marsh North, North West, And South West Of Neat Marsh Road Preston East Riding Of Yorkshire HU12 8TP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a solar farm comprising ground mounted solar PV panels with an installed capacity of 49.99MW AC including mounting system, transformers, inverters, underground cabling, fencing, CCTV, internal tracks and associated infrastructure, landscaping, biodiversity net gain and environmental enhancements for a temporary period of 50 years and a permanent substation with switch room, 15m high communications tower, fencing, and CCTV
As published by the council, reference 25/01811/STPLF
Application record
- Reference
- 25/01811/STPLF
- Type
- Strategic - Full Planning Permission
- Status
- Application Approved
- Decision
- Approve
- Received
- 26 Jun 2025
- Validated
- 18 Jul 2025
- Decided
- 7 Aug 2026
- Ward
- South West Holderness
- Parish
- Preston Parish Council
- Decision by
- Committee Decision
- Postcode
- HU12 8TP
Timeline
Dates from the published record
-
26 Jun 2025
Received by East Riding of Yorkshire
-
18 Jul 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Decision issued: Approve
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
116 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Yorkshire Water Services Limited Waste Water Treatment Works Hull Road Saltend East Riding Of Yorkshire HU12 8EY
Variation of Condition 3 (time period) for planning permission 05/08754/STPLF (Erection of a wind turbine - resubmission of 05/05037/STPLF) to allow an additional 5 years of operation until 1 February 2033
Granted Amendments 21 docs
Other full applications applications
In East Riding of Yorkshire
-
26/01559/PLF Granted
Alfred Bean Hospital Bridlington Road Driffield East Riding Of Yorkshire YO25 5JR
Erection of electrical substation enclosure and associated works
-
26/01683/PLF Granted
North View Main Street Fangfoss East Riding Of Yorkshire YO41 5QH
Erection of porch to front following removal of existing porch and erection of single storey extension to rear and side
-
26/01760/PLF Granted
53 West End Road Cottingham East Riding Of Yorkshire HU16 5PW
Erection of detached outbuilding
-
26/01628/PLF Granted
8 Britannia Road Bridlington East Riding Of Yorkshire YO16 4ET
Conversion of existing integral garage to additional living accommodation with associated alterations
-
26/01744/PLF Granted
3 Selby Road Howden East Riding Of Yorkshire DN14 7JW
Erection of single storey extension to rear following demolition of existing