Planning application
Land East Of Mercedes Benz Of Hull Wyke Way Melton East Riding Of Yorkshire HU14 3BQ
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
EIA Screening Opinion - Phase 2 Melton West, Melton
As published by the council, reference 22/03461/EIASCR
Application record
- Reference
- 22/03461/EIASCR
- Type
- EIA Screening Opinion
- Status
- Answered
- Decision
- Enquiry Answered
- Received
- 24 Oct 2022
- Validated
- 24 Oct 2022
- Decided
- 25 Oct 2022
- Ward
- South Hunsley
- Parish
- Welton Parish Council
- Decision by
- Delegated Decision
- Postcode
- HU14 3BQ
Timeline
Dates from the published record
-
24 Oct 2022
Received by East Riding of Yorkshire
-
25 Oct 2022
Decision issued: Enquiry Answered
-
30 Jul 2026
Added to PlanIndex
After the decision
East Riding of Yorkshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land North Of Operational Support Humberside Police Wyke Way Melton East Riding Of Yorkshire HU14 3BQ
90% historically approved · decision due ~24 Aug
Non-Material Amendment to planning reference 24/03730/STVAR to allow various alterations to the scheme layout including omission of store 1 and 2 from the plant area; alterations to tree planting locations; corrected plans for attenuation pond and swale geometry; changes to security fencing, external doors, glazing, design and materials; alterations to plant enclosure; increase in sprinkler plant size; increase in sprinkler tank size; and confirmation of PV layout
Awaiting decision Amendments Windows or glazing 2 docs -
Shell Garage Grandale Filling Station A63 Melton Interchange To Welton Interchange Welton East Riding Of Yorkshire HU14 3HH
Submission of details required by Condition 2 (verification report) of planning permission 18/00571/VAR
Granted Conditions 9 docs -
Origin Packaging Limited Melton House Jackson Way Melton East Riding Of Yorkshire HU14 3HJ
Erection of entrance porch extension to side, erection of boundary fencing with security turnstile accesses, erection of a sub-station building and external alterations including installation of a new roller shutter to rear, and new door, windows and louvres to side
Granted Full applications Extension Windows or glazing 17 docsSmall domestic -
20 Melton Old Road Melton East Riding Of Yorkshire HU14 3HP
Erection of a single storey extension to side
Granted Full applications Extension 9 docsSmall domestic -
School House South Hunsley School And Sixth Form College 41 East Dale Road Melton East Riding Of Yorkshire HU14 3HS
Submission of details required by Conditions 2 (Construction Method Statement), 3 (Arboricultural Method Statement), 4 (Approved Tree Protection Scheme), 12 (Floor Levels) of planning permission 24/01397/PLF
Granted Conditions Trees 9 docs
Other outline applications
In East Riding of Yorkshire
-
26/01665/OUT Withdrawn
Willow Rise The Balk Pocklington East Riding Of Yorkshire YO42 2NY
OUTLINE - Erection of 4 dwellings following demolition of existing (layout and scale to be considered)
-
26/01923/OUT Awaiting decision
Land North West Of The Oaks Oaklands Avenue Howden East Riding Of Yorkshire DN14 7BA
Erection of 1 custom-build dwelling (Access to be considered)
-
26/01845/PIP Awaiting decision
Land South Of 19 Moor End Holme Upon Spalding Moor East Riding Of Yorkshire YO43 4DP
Permission in Principle - Erection of 5-6 bungalows
-
26/01344/OUT Awaiting decision
Land South West Of 4 Bessingby Gate Bridlington East Riding Of Yorkshire YO16 4RE
Outline - Erection of dwelling (all matters reserved)
-
25/03024/STOUT Awaiting decision
Land West Of Dimlington Gas Terminal Site 2 Dimlington Road Easington East Riding Of Yorkshire HU12 0TN
OUTLINE - Erection of a Hydrogen Production Facility including electrolyser equipment and buildings, hydrogen compressor and shelter, LP hydrogen compression, gas handling equipment and gas holders, hydrogen metering, cooling water package, refrigeration package, water purification and demineralisation including storage, main interconnecting pipe-racks and pipe-tracks, service buildings, electrical substations, security fencing, landscaping, sustainable drainage, biodiversity net gain associated infrastructure and works (Access to be considered)