Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Mill Hill Ellerker East Riding Of Yorkshire HU15 2DG

Granted East Riding of Yorkshire 22/02494/PLF Full Planning Permission

Works: Extension Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two storey extension to side, single storey extension to rear and construction of two bay windows to front following demolition of existing single storey side projection (resubmission of 19/01599/PLF)

As published by the council, reference 22/02494/PLF

Application record

Reference
22/02494/PLF
Type
Full Planning Permission
Status
Application Approved
Decision
Approve
Received
26 Jul 2022
Validated
15 Aug 2022
Decided
15 Dec 2022
Ward
Dale
Parish
Ellerker Parish Council
Decision by
Special Delegated
Postcode
HU15 2DG

Timeline

Dates from the published record

  1. 26 Jul 2022

    Received by East Riding of Yorkshire

  2. 15 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 15 Dec 2022

    Decision issued: Approve

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In East Riding of Yorkshire

  • 26/01559/PLF Granted

    Alfred Bean Hospital Bridlington Road Driffield East Riding Of Yorkshire YO25 5JR

    Erection of electrical substation enclosure and associated works

    17 Jun 2026 Full applications
  • 26/01683/PLF Granted

    North View Main Street Fangfoss East Riding Of Yorkshire YO41 5QH

    Erection of porch to front following removal of existing porch and erection of single storey extension to rear and side

    1 Jul 2026 Full applications
  • 26/01760/PLF Granted

    53 West End Road Cottingham East Riding Of Yorkshire HU16 5PW

    Erection of detached outbuilding

    6 Jul 2026 Full applications
  • 26/01628/PLF Granted

    8 Britannia Road Bridlington East Riding Of Yorkshire YO16 4ET

    Conversion of existing integral garage to additional living accommodation with associated alterations

    24 Jun 2026 Full applications
  • 26/01744/PLF Granted

    3 Selby Road Howden East Riding Of Yorkshire DN14 7JW

    Erection of single storey extension to rear following demolition of existing

    3 Jul 2026 Full applications