Planning application
Saltend Chemicals Park Saltend Lane Saltend East Riding Of Yorkshire HU12 8DS
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Environmental screening opinion on a proposed Carbon Dioxide Liquid Storage and Vapour Recovery facility
As published by the council, reference 22/01687/EIASCR
Application record
- Reference
- 22/01687/EIASCR
- Type
- EIA Screening Opinion
- Status
- Answered
- Decision
- Enquiry Answered
- Received
- 16 May 2022
- Validated
- 16 May 2022
- Decided
- 30 May 2022
- Ward
- South West Holderness
- Parish
- Preston Parish Council
- Decision by
- Delegated Decision
- Postcode
- HU12 8DS
Timeline
Dates from the published record
-
16 May 2022
Received by East Riding of Yorkshire
-
30 May 2022
Decision issued: Enquiry Answered
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
East Riding of Yorkshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land South East Of Workshop WS50 Saltend Chemicals Park Saltend Lane Saltend East Riding Of Yorkshire HU12 8DS
Construction of a facility to receive and process up to 600 tonnes per day of raw gaseous carbon dioxide (CO2) from Vivergo Fuels Ltd with new pipeline connection to existing marine terminal installed on an existing pipe bridge extending from the production area to the jetty
Granted Full applications 64 docs
Other outline applications
In East Riding of Yorkshire
-
26/01665/OUT Withdrawn
Willow Rise The Balk Pocklington East Riding Of Yorkshire YO42 2NY
OUTLINE - Erection of 4 dwellings following demolition of existing (layout and scale to be considered)
-
26/01923/OUT Awaiting decision
Land North West Of The Oaks Oaklands Avenue Howden East Riding Of Yorkshire DN14 7BA
Erection of 1 custom-build dwelling (Access to be considered)
-
26/01845/PIP Awaiting decision
Land South Of 19 Moor End Holme Upon Spalding Moor East Riding Of Yorkshire YO43 4DP
Permission in Principle - Erection of 5-6 bungalows
-
26/01344/OUT Awaiting decision
Land South West Of 4 Bessingby Gate Bridlington East Riding Of Yorkshire YO16 4RE
Outline - Erection of dwelling (all matters reserved)
-
25/03024/STOUT Awaiting decision
Land West Of Dimlington Gas Terminal Site 2 Dimlington Road Easington East Riding Of Yorkshire HU12 0TN
OUTLINE - Erection of a Hydrogen Production Facility including electrolyser equipment and buildings, hydrogen compressor and shelter, LP hydrogen compression, gas handling equipment and gas holders, hydrogen metering, cooling water package, refrigeration package, water purification and demineralisation including storage, main interconnecting pipe-racks and pipe-tracks, service buildings, electrical substations, security fencing, landscaping, sustainable drainage, biodiversity net gain associated infrastructure and works (Access to be considered)