Planning application
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of an extension to existing waste storage building
As published by the council, reference 20/03491/CM
Application record
- Reference
- 20/03491/CM
- Type
- County Matter
- Status
- Application Approved
- Decision
- Granted As published: Approve
- Received
- 19 Oct 2020
- Validated
- 6 Nov 2020
- Decided
- 3 Mar 2021
- Ward
- South Hunsley
- Parish
- Welton Parish Council
- Decision by
- Committee Decision
- Postcode
- HU14 3HH
Site history
Applications at this address on the East Riding of Yorkshire register
This site has had 4 applications since 2020: 4 approved, 0 refused.
-
21/03248/CM Granted
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Variation of Condition 26 (opening hours of the site for operations, sales and deliveries) of planning permission 07/02793/STPLF (Erection of a wood shredding building) to allow 24 hour operation of the existing waste transfer station
-
20/03811/CM Granted
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Erection of extensions to existing Waste Processing Building (Sheds 4 and 5)
-
20/03493/CM Granted
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Erection of an extension to wood burning plant room
Timeline
Dates from the published record
-
19 Oct 2020
Received by East Riding of Yorkshire
-
6 Nov 2020
Validated
Checked as complete and ready for consideration.
-
3 Mar 2021
Decision issued: Approve
-
25 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Piercy Design Ltd Agent, a design practice registered in Driffield
Active · incorporated 2005 · Driffield
41 applications on PlanIndex · across 6 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
39 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Riding of Yorkshire granted permission on 3 March 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Melton Recycling Facility Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Removal of Condition 3 (Feedstock from Waste Transfer Station only) of planning permission 21/03258/CM (Variation of Condition 5 (hours of operation - to allow 24 hour operation of existing waste transfer station) of planning permission 20/03491/CM (Erection of an extension to existing waste storage building)
Withdrawn Other Extension 19 docs -
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Variation of Condition 26 (opening hours of the site for operations, sales and deliveries) of planning permission 07/02793/STPLF (Erection of a wood shredding building) to allow 24 hour operation of the existing waste transfer station
Granted Other 62 docs -
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton North Ferriby East Riding Of Yorkshire HU14 3HH
Erection of boiler house extension to existing Waste Processing Building (Sheds 4 and 5) (Retrospective)
Granted Other Extension 35 docs -
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Erection of extensions to existing Waste Processing Building (Sheds 4 and 5)
Granted Other Extension 51 docs -
Transwaste Recycling And Aggregates Limited Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Erection of an extension to wood burning plant room
Granted Other Extension 29 docs -
Melton Stone Supplies Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Change of use of land and continued use of offices/sales building and polytunnel covered storage/workshop (Retrospective Application)
Granted Full applications 8 docs
Other less common application types
In East Riding of Yorkshire
-
26/01696/REG3 Granted
South Cliff Holiday Park Solar Farm Pioneer Road Wilsthorpe East Riding Of Yorkshire YO15 3QJ
Installation of substation/battery infrastructure to approved solar farm extension (Application No. 25/03255/REG3)
-
26/00380/CM Withdrawn
Melton Recycling Facility Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Removal of Condition 3 (Feedstock from Waste Transfer Station only) of planning permission 21/03258/CM (Variation of Condition 5 (hours of operation - to allow 24 hour operation of existing waste transfer station) of planning permission 20/03491/CM (Erection of an extension to existing waste storage building)
-
26/02379/REG3 Awaiting decision
5 Pasture Close Kilham East Riding Of Yorkshire YO25 4SE
Construction of access ramp with galvanised steel handrails and installation of a new front door with window following removal of existing window to front
-
26/01994/REG3 Awaiting decision
Burlington Centre Long Lane Bridlington East Riding Of Yorkshire YO16 7NE
Erection of 2.4m high closeboard fence
-
26/01939/CM Awaiting decision
Mytum And Selby Bristows Tip Hook Pasture Lane Goole East Riding Of Yorkshire DN14 8BJ
Restoration of existing tip, redesign of operational waste management facility and regularisation of the existing site including: erection of two Nissen buildings; erection of an open sided building; liquid neutralising tanks (retrospective); concrete batching plant (retrospective); regrading and capping of the tip; surface water management scheme (below ground tanks and above ground swales); and associated landscaping and aftercare scheme