Planning application
26/00456/P
Brunton Court Musselburgh East Lothian
Proposal
Installation of container and associated works
As published by the council, reference 26/00456/P
Timeline
Dates from the published record
-
30 Apr 2026
Received by East Lothian
-
22 Jun 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
Checking the current position
The process from here
The published feed does not show a live status for this application, which usually means the council register holds more recent detail than the copy PlanIndex receives.
The council portal linked on this page carries the authoritative version, including the documents, any consultation deadline and the decision once made. PlanIndex refreshes its copy of the register on a daily cycle.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/00980/LBC Granted
13A, 13, 15 Bridge Street Musselburgh EH21 6AA
Replacement roof tiles
-
25/00979/P Granted
13A, 13, 15 Bridge Street Musselburgh EH21 6AA
Replacement roof tiles
-
25/01009/PNW Withdrawn
27 Bridge Street Musselburgh East Lothian EH21 6AA
Replacement windows
-
25/01317/PNW Withdrawn
17A Bridge Street Musselburgh EH21 6AA
Replacement windows
-
26/00001/SCR Decided
Brunton Hall Ladywell Way Musselburgh East Lothian EH21 6AF
Screening Opinion - Replacement of the Brunton Hall including up to the full demolition of the existing building and rebuilding to provide facilities for the arts and potential commercial redevelopment of the remaining land. The existing building has the presence of Reinforced Autoclaved Aerated Concrete (RAAC) in the roof structure and remediation options are deemed financially unviable, prompting a reassessment of the building's future. The redevelopment of the Brunton site offers the opportunity to create a landmark cultural destination within one of Scotland's fastest growing regions. A new facility has the potential to complement Edinburgh and East Lothian's leisure and tourism assets, while serving a growing local population and aims to secure a sustainable future for cultural provision in the town. The site lies within a town centre environmental and as such is not considered to have any special or significant habitat other than that which is common within an urban environmental (hard pavement and roads). Although the Brunton Hall site is not within the Musselburgh Conservation Area, the boundary of the Conservation Area is adjacent to the site. It is therefore important that any development of the site should have sensitivity to its placing and relevant discussions and consultations with the local authority planning department will take place.
-
25/00986/LBC Granted
12 Bridge Street Fisherrow Musselburgh EH21 6AH
Internal alterations
Other full applications applications
In East Lothian
-
26/00390/P Granted
Land At Howden Farm Yester Gifford East Lothian
Erection of fencing and gate (Retrospective)
-
26/00535/P Granted
13 Letham Mains Holdings Haddington EH41 4NW
Change of use of agricultural paddock to domestic garden ground and erection of garage
-
26/00787/P Status unknown
Innisfree 10 Westerdunes Park North Berwick EH39 5HJ
Installation of 4 CCTV cameras
-
26/00783/P Status unknown
1A, 1B And 1D The Shore Colvin Street Dunbar East Lothian EH42 1HE
Alterations to building
-
26/00786/P Status unknown
Land East Of Old Millfield Ballencrieff Aberlady East Lothian
Change of use of woodland area for the siting of camping pods, erection of associated maintenance storage shed, widening of vehicle access and associated works