Planning application
Roselea Cottage Pencaitland East Lothian EH34 5DH
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension to house
As published by the council, reference 26/00010/P
Application record
- Reference
- 26/00010/P
- Type
- Planning Permission
- Status
- Permitted
- Decision
- Granted As published: Granted Permission
- Received
- 6 Jan 2026
- Validated
- 13 Jan 2026
- Decided
- 6 Feb 2026
- Ward
- Haddington And Lammermuir
- Parish
- Pencaitland Community Council
- Decision by
- Scheme of Delegation Decision
- Postcode
- EH34 5DH
Timeline
Dates from the published record
-
6 Jan 2026
Received by East Lothian
-
13 Jan 2026
Validated
Checked as complete and ready for consideration.
-
6 Feb 2026
Decision issued: Granted Permission
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Lothian granted permission on 6 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Railway Walk To The South Of Montesinos House Broomrigg Pencaitland East Lothian
Change of use of railway banking for the formation of pedestrian access, replacement and upgrading of steps, erection of handrails and erection of gate (Retrospective)
Granted Full applications 9 docs -
Pencaitland Maltings Pencaitland Tranent EH34 5DQ
Erection of a Renewable Electro-Hydrogen Energy Centre and associated works
Granted Full applications 23 docs -
Baird Maltings Pencaitland EH34 5DQ
97% historically approved · decision due ~14 Aug
The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.
Awaiting decision Demolition
Other full applications
In East Lothian
-
26/00935/P Awaiting decision
25 Fleets Grove Tranent EH33 2QB
Erection of conservatory
-
26/00941/P Awaiting decision
33 Rig Street Aberlady East Lothian EH32 0RP
Formation of roof windows
-
26/00934/P Awaiting decision
Flat A Marine View Edinburgh Road Belhaven Dunbar EH42 1TS East Lothian EH42 1TS
Extension to flat
-
26/00931/P Awaiting decision
20 Dirleton Avenue North Berwick EH39 4BQ
Erection of substation
-
26/00928/P Awaiting decision
27 Lydgait Gardens Haddington EH41 3DB
Extension to house