26/00001/SCR
Brunton Hall Ladywell Way Musselburgh East Lothian EH21 6AF
Proposal
Screening Opinion - Replacement of the Brunton Hall including up to the full demolition of the existing building and rebuilding to provide facilities for the arts and potential commercial redevelopment of the remaining land. The existing building has the presence of Reinforced Autoclaved Aerated Concrete (RAAC) in the roof structure and remediation options are deemed financially unviable, prompting a reassessment of the building's future. The redevelopment of the Brunton site offers the opportunity to create a landmark cultural destination within one of Scotland's fastest growing regions. A new facility has the potential to complement Edinburgh and East Lothian's leisure and tourism assets, while serving a growing local population and aims to secure a sustainable future for cultural provision in the town. The site lies within a town centre environmental and as such is not considered to have any special or significant habitat other than that which is common within an urban environmental (hard pavement and roads). Although the Brunton Hall site is not within the Musselburgh Conservation Area, the boundary of the Conservation Area is adjacent to the site. It is therefore important that any development of the site should have sensitivity to its placing and relevant discussions and consultations with the local authority planning department will take place.
As published by the council, reference 26/00001/SCR
Timeline
Dates from the published record
-
2 Feb 2026
Received by East Lothian
-
10 Mar 2026
Decision issued: EIA not required
-
29 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
26/00679/LBC Status unknown
6A And 6B Links Street Musselburgh East Lothian EH21 6JL
Alterations to building (Part Retrospective)
-
26/00064/LBC Granted
26 Bridge Street Musselburgh EH21 6AG
Formation of pedestrian access, erection of gate (Retrospective)
-
26/00063/P Granted
26 Bridge Street Musselburgh EH21 6AG
Formation of pedestrian access, erection of gate (Retrospective)
-
25/01026/ADV Granted
Footpath Adjacent To 119-121 North High Street Musselburgh EH21 6JE
Display of advertisements
-
25/01025/P Granted
Footpath Adjacent To 119-121 North High Street Musselburgh EH21 6JE
Installation of street hub unit
-
25/00921/P Granted
12A Links Street Musselburgh EH21 6JL
Formation of dormers
Other outline applications
In East Lothian
-
26/00006/SCR Status unknown
Blindwells East Lothian
The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed
-
26/00005/SCR Status unknown
Baird Maltings Pencaitland EH34 5DQ
The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.
-
26/00196/PP Refused
Garden Ground Of 43 Dunbar Road Haddington East Lothian
Planning Permission in Principle for the erection of 1 house
-
26/00004/SCR Decided
Land To North Of A199 At Beanston Farm Haddington East Lothian
Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.
-
26/00570/SCO Status unknown
Howden Farm Gifford EH41 1JS
60,000 capacity free range hen shed to be located in Howden Farm. Access is from the B6355