Skip to content
PlanIndex Get alerts
Menu

Planning application

Ormiston Primary School Meadowbank Ormiston EH35 5NQ

Granted East Lothian 25/01297/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to building, erection of railings and gates, removal of gates and railings (Part Retrospective)

As published by the council, reference 25/01297/LBC

Application record

Reference
25/01297/LBC
Type
Listed Building Consent
Status
Permitted
Decision
Consent Granted
Received
14 Nov 2025
Validated
23 Jan 2026
Decided
5 May 2026
Ward
Haddington And Lammermuir
Parish
Ormiston Community Council
Decision by
Scheme of Delegation Decision
Postcode
EH35 5NQ

Site history

Applications at this address on the East Lothian register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • 26/00538/P Decided

    Ormiston Primary School Meadowbank Ormiston EH35 5NQ

    Alterations to building

    Submitted 22 May 2026 Full applications
  • 25/01295/P Granted

    Ormiston Primary School Meadowbank Ormiston EH35 5NQ

    Alterations to building, erection of railings and gates (Part Retrospective)

    Decided 5 May 2026 Full applications

Timeline

Dates from the published record

  1. 14 Nov 2025

    Received by East Lothian

  2. 23 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 5 May 2026

    Decision issued: Consent Granted

  4. 29 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Lothian granted permission on 5 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Lothian

  • 26/00900/LBC Awaiting decision

    11 West Fenton Cottages Gullane North Berwick EH39 5AL

    Alterations, extension to building, formation of dormers and first floor terrace with balustrading

    28 Aug 2026 Heritage and listed buildings
  • 26/00878/LBC Awaiting decision

    Flat 4 10 West Bay Road North Berwick EH39 4AW

    Alterations to building

    21 Aug 2026 Heritage and listed buildings
  • 25/01123/LBC Granted

    8 St Martins Gate Haddington East Lothian EH41 4BA

    Replacement of roof.

    2 Oct 2025 Heritage and listed buildings
  • 26/00855/LBC Awaiting decision

    Winton House Pencaitland Tranent EH34 5AT

    Alterations to building

    17 Aug 2026 Heritage and listed buildings
  • 26/00854/LBC Awaiting decision

    6 Main Street East Saltoun Tranent EH34 5DZ

    Alterations to building and formation of soakaway (Part retrospective)

    14 Aug 2026 Heritage and listed buildings