Planning application
Land To The South Of Spott Road Industrial Estate Spott Road Dunbar East Lothian
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
The proposed development will provide approximately 230 parking spaces, cycle parking and bus stops. The car park will operate as a Park and Ride for staff working at Torness during the works associated related to the EGL1 project. The works are Torness are expected to last for 3 years. The proposals also include associated infrastructure and engineering works that involve groundworks, drainage and providing a road connection from Spott Road industrial estate. The proposal also involves the formation of an access road, car parking, bus stop and associated infrastructure. Details of the proposals are contained in Appendix 2 of the attached EIA Screening Opinion request.
As published by the council, reference 25/00006/SCR
Application record
- Reference
- 25/00006/SCR
- Type
- Screening Opinion
- Status
- Permitted
- Decision
- EIA not required
- Received
- 1 Sep 2025
- Validated
- 1 Sep 2025
- Decided
- 19 Sep 2025
- Ward
- Dunbar
- Parish
- Dunbar Community Council
Timeline
Dates from the published record
-
1 Sep 2025
Received by East Lothian
-
19 Sep 2025
Decision issued: EIA not required
-
29 Jul 2026
Added to PlanIndex
Documents
4 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
After the decision
East Lothian has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The South Of Spott Road Industrial Estate Dunbar East Lothian
Formation of car park and ride facility and associated works for a temporary period of 5 years
Granted Full applications 18 docs -
Plots 3A And 3B Spott Road Industrial Estate Dunbar East Lothian
Formation of access road, hardstanding areas, erection of storage units, fencing and gates
Granted Full applications 7 docs -
49 Comrie Avenue Dunbar EH42 1ZN
Heightening of fencing (Retrospective)
Granted Full applications 7 docs -
Site East Of Howden's Joinery Spott Road Industrial Estate Dunbar East Lothian
Erection of storage container (class 6), change of use of site (class 4) to bus storage depot, siting of ancillary buildings, fencing and gates
Granted Full applications 14 docs -
25 Sinton Park Dunbar EH42 1ZP
Heated single story extension to the rear of the property
Granted Full applications Extension 10 docs -
5 Sinton Park Dunbar East Lothian EH42 1ZP
Certificate of lawfulness for extension to house and formation of decked area
Granted Lawful development Extension 4 docs
Other outline applications
In East Lothian
-
26/00469/PP Withdrawn
Land East Of Drummore House Wallyford Toll Wallyford East Lothian
Planning permission in principle for the erection of a 60-bed care home, 10 associated extra care apartments (Class 8), car parking, landscaping, and associated works
-
26/00006/SCR Status unknown
Blindwells East Lothian
The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed
-
26/00005/SCR Decided
Baird Maltings Pencaitland EH34 5DQ
The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.
-
26/00196/PP Refused
Garden Ground Of 43 Dunbar Road Haddington East Lothian
Planning Permission in Principle for the erection of 1 house
-
26/00004/SCR Decided
Land To North Of A199 At Beanston Farm Haddington East Lothian
Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.