Planning application
135 High Street Dunbar EH42 1ES
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to building, installation of ATM machine and erection of signage
As published by the council, reference 24/01184/LBC
Application record
- Reference
- 24/01184/LBC
- Type
- Listed Building Consent
- Status
- Permitted
- Decision
- Granted As published: Consent Granted
- Received
- 31 Oct 2024
- Validated
- 14 Nov 2024
- Decided
- 9 Jan 2025
- Ward
- Dunbar
- Parish
- Dunbar Community Council
- Decision by
- Delegated Decision
- Postcode
- EH42 1ES
Site history
Applications at this address on the East Lothian register
This site has had 6 applications since 2024: 6 approved, 0 refused.
-
24/01183/P Granted
135 High Street Dunbar EH42 1ES
Alterations to building and installation of ATM machine
-
24/01182/ADV Granted
135 High Street Dunbar EH42 1ES
Display of advertisement
-
24/01159/LBC Granted
135 High Street Dunbar EH42 1ES
Alterations to building (Retrospective)
-
24/01158/P Granted
135 High Street Dunbar EH42 1ES
Installation of air conditioning units (Retrospective)
-
24/00880/ADV Granted
135 High Street Dunbar EH42 1ES
Display of Advertisement
Timeline
Dates from the published record
-
31 Oct 2024
Received by East Lothian
-
14 Nov 2024
Validated
Checked as complete and ready for consideration.
-
9 Jan 2025
Decision issued: Consent Granted
-
19 Sep 2026
Added to PlanIndex
Documents
11 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
East Lothian granted permission on 9 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Parking Space Associated With 161A High Street Dunbar East Lothian EH42 1ES
96% historically approved · decision due ~1 Jan
Erection of garage and associated works
Awaiting decision Full applications -
135 High Street Dunbar East Lothian EH42 1ES
Installation of shutter
Granted Full applications 7 docs -
135 High Street Dunbar East Lothian EH42 1ES
Alterations to building and installation of signage
Granted Heritage and listed buildings 6 docs -
135 High Street Dunbar EH42 1ES
Alterations to building and installation of ATM machine
Granted Full applications 9 docs -
-
Other heritage and listed building applications
In East Lothian
-
26/01217/LBC Awaiting decision
38 Court Street Haddington EH41 3NP
Replacement windows
-
26/01205/LBC Awaiting decision
39 West Holmes Gardens Musselburgh EH21 6QW
Replacement windows
-
26/01199/LBC Awaiting decision
13 Church Street Haddington East Lothian EH41 3EX
Erection of signage
-
26/01182/LBC Awaiting decision
Penkaet Rigg Pencaitland Tranent EH34 5EY
Extensions to building and formation of decking and steps
-
26/01185/LBC Awaiting decision
178 North High Street Musselburgh East Lothian EH21 6BH
Alteration, extension to building and formation of hardstanding area