Skip to content
PlanIndex Get alerts
Menu

Planning application

Land North Of Pitcox East Lothian EH42 1RG

Granted East Lothian 23/00007/SGC Scottish Government Consultation

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Section 37 Screening Opinion for Pitcox BESS ( ECU00004992)

As published by the council, reference 23/00007/SGC

Application record

Reference
23/00007/SGC
Type
Scottish Government Consultation
Status
Permitted
Decision
Granted As published: Granted by Scottish Ministers
Received
12 Dec 2023
Validated
12 Dec 2023
Decided
14 May 2024
Ward
Dunbar
Parish
East Lammermuir Community Council
Postcode
EH42 1RG

Site history

Applications at this address on the East Lothian register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • 25/00001/SGC Status unknown

    Land North Of Pitcox East Lothian EH42 1RG

    Section 36 - The development of a Battery Energy Storage System (BESS) and associated infrastructure,including connecting underground cabling to the existing substation, on approximately 1.4 hectares of land north of Pitcox, East Lothian, EH42 1RG (ECU00004992)

    Submitted 26 Mar 2025 Outline

Timeline

Dates from the published record

  1. 12 Dec 2023

    Received by East Lothian

  2. 14 May 2024

    Decision issued: Granted by Scottish Ministers

  3. 20 Nov 2026

    Added to PlanIndex

Documents

2 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

East Lothian granted permission on 14 May 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land North Of Pitcox East Lothian EH42 1RG

    25/00001/SGC Submitted 26 Mar 2025 50 yards away

    96% historically approved · decision due ~21 May

    Section 36 - The development of a Battery Energy Storage System (BESS) and associated infrastructure,including connecting underground cabling to the existing substation, on approximately 1.4 hectares of land north of Pitcox, East Lothian, EH42 1RG (ECU00004992)

    Status unknown Outline 2 docs
  • South Belton Farm Hedderwick West Barns East Lothian

    24/00160/NAF Submitted 15 Feb 2024 400 yards away

    Prior notification of - Erection of agricultural building

    Decided Other 4 docs

In East Lothian

  • 26/00469/PP Withdrawn

    Land East Of Drummore House Wallyford Toll Wallyford East Lothian

    Planning permission in principle for the erection of a 60-bed care home, 10 associated extra care apartments (Class 8), car parking, landscaping, and associated works

    Received 4 May, published by the council 29 Jul 2026 Outline
  • 26/00006/SCR Status unknown

    Blindwells East Lothian

    The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed

    Received 14 Jul, published by the council 29 Jul 2026 Outline
  • 26/00005/SCR Decided

    Baird Maltings Pencaitland EH34 5DQ

    The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.

    Received 19 Jun, published by the council 29 Jul 2026 Outline
  • 26/00196/PP Refused

    Garden Ground Of 43 Dunbar Road Haddington East Lothian

    Planning Permission in Principle for the erection of 1 house

    Received 19 Feb, published by the council 29 Jul 2026 Outline
  • 26/00004/SCR Decided

    Land To North Of A199 At Beanston Farm Haddington East Lothian

    Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.

    Received 18 May, published by the council 29 Jul 2026 Outline