Skip to content
PlanIndex Get alerts
Menu

Planning application

GLEBE FARM MAIN ROAD EAST KEAL

Refused East Lindsey S/045/01676/21 Prior Approval-Ag to Dwelling House

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Determination of whether or not prior approval is required as to a) transport and highways impacts of the development, b) the noise impacts of the development, c) Contamination risks on the site, d) flooding risks on the site, e) whether the location or siting of the building makes it otherwise impractical or undesirable for the building to change from agricultural use to provide 1no. dwelling falling within Class C3 (dwellinghouses) of the Schedule to the Use Classes Order f) design or external appearance of the building and g) the provision of adequate natural light in all habitable rooms of the dwellinghouse.

As published by the council, reference S/045/01676/21

Application record

Reference
S/045/01676/21
Type
Prior Approval-Ag to Dwelling House
Status
Decided
Decision
Refused
Received
3 Aug 2021
Validated
5 Aug 2021
Decided
30 Sep 2021
Ward
Halton Holegate Ward
Parish
East Keal
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 3 Aug 2021

    Received by East Lindsey

  2. 5 Aug 2021

    Validated

    Checked as complete and ready for consideration.

  3. 30 Sep 2021

    Decision issued: Refused

  4. 21 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this refusal means

East Lindsey refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

In East Lindsey

  • 01513/26/ABH Awaiting decision

    The Firs 2 Woodland Drive Woodhall Spa Lincolnshire LN10 6YF

    Determination of prior approval for proposed single storey extension to provide a kitchen which extends 4.7 metres beyond the rear wall of the original dwellinghouse. The maximum height of the enlarged part of the dwellinghouse is 3.5 metres and the height of the eaves of the enlarged part of the dwellinghouse is 2.47 metres.

    Received 16 Sep, published by the council 18 Sep 2026 Prior approval
  • 01510/26/ABH Awaiting decision

    The Haven South Street Swineshead Boston PE20 3JD

    Application for Prior Approval under Schedule 2, Part 1, Class A of The Town and Country Planning (General Permitted Development) (England) Order 2015 for the construction of a single storey rear extension

    Received 14 Sep, published by the council 18 Sep 2026 Prior approval
  • B/26/0320 Decided

    Land Off Rochford Tower Lane, Fishtoft, PE21 9RH

    Application under Class A, Part 6, Schedule 2 of The Town and Country Planning (General Permitted Development)(England) Order 2015 to determine if prior approval is required for agricultural reservoir

    Received 17 Aug, published by the council 18 Sep 2026 Prior approval
  • B/26/0317 Granted

    Agricultural Land North West Of The Beeches, Clatterdyke Road, Frampton, Boston, PE20 1AL

    Application under Schedule 2, Part 6 of The Town and Country Planning (General Permitted Development)(England) Order 2015 to determine if prior approval is required for agricultural reservoir

    Received 11 Aug, published by the council 18 Sep 2026 Prior approval
  • 01477/26/ABC Awaiting decision

    Willow Farm Holmes Road Horsington Lincolnshire LN10 5HS

    Determination of whether or not prior approval is required for the siting, design and external appearance of the livestock building to be erected.

    Received 8 Sep, published by the council 13 Sep 2026 Prior approval