Planning application
St. Catherine's Farm, Bellwater Bank, Eastville, BOSTON, PE22 8LN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Planning Permission - To continue composting operations and erect additional towers and fully enclose batch tunnels with bio filter systems.
As published by the council, reference N/047/00654/05
Application record
- Reference
- N/047/00654/05
- Type
- County Matter - Application Transferred
- Status
- Decided
- Decision
- Granted As published: No Objection
- Received
- 15 Mar 2005
- Validated
- 15 Mar 2005
- Decided
- 6 Apr 2005
- Decision by
- Delegated
- Postcode
- PE22 8LN
Site history
Applications at this address on the East Lindsey register
This site has had 5 applications since 2004: 3 approved, 1 refused.
-
S/047/02145/04 Refused
St. Catherine's Farm, Bellwater Bank, Eastville, BOSTON, PE22 8LN
Planning Permission - To continue to use land and building for composting, install additional plant and machinery, including 7 additional towers and to use concrete pad to windrow materials for maturation.
-
S/047/01983/04 Decided
St. Catherine's Farm, Bellwater Bank, Eastville, BOSTON, PE22 8LN
Environmental Impact Assessment (E.E.C Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C) for a screening opinion with respect to extending the site to create additional storage for timber and finished compost.
-
S/047/00959/04 Granted
St. Catherine's Farm, Bellwater Bank, Eastville, BOSTON, PE22 8LN
Planning Permission - To continue composting process and use of building for the storage of hatchery waste without complying with condition no.2 stating (only those waste specified in the application, i.e green/organic and putrescible waste shall be brought to and composted at the site, except with the written agreement of the Director of Highways and Planning and no animal tissue waste or sewage sludge shall be imported onto the site) as imposed on planning permission reference S/047/0729/01.
-
S/047/00936/04 Granted
St. Catherine's Farm, Bellwater Bank, Eastville, BOSTON, PE22 8LN
Planning Permission - To use land as an extension to the existing site to create additional storage for timber and finished compost.
Timeline
Dates from the published record
-
15 Mar 2005
Received by East Lindsey
-
6 Apr 2005
Decision issued: No Objection
-
17 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Lindsey granted permission on 6 April 2005, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Other less common application types
In East Lindsey
-
01624/26/LC3 Awaiting decision
Halton Holegate Church Of England School 16 Station Road Halton Holegate Lincolnshire PE23 5PB
To vary condition 2 (five year time limit) of planning permission s/072/02269/21/3; to seek retrospective planning permission to retain existing mobile classroom for a further five years - County matter application.
-
01640/26/CMA Awaiting decision
Qwackers Preschool Hanby Lane Alford Lincolnshire LN13 9BL
To vary condition 1 (five year time limit) of planning permission N/003/02196/21/3; to retain existing mobile classroom for a further five years - County matters application.
-
01678/26/FMB Awaiting decision
Cowbridge Farm Cowbridge Road Bicker Boston Lincolnshire PE20 3BN
Exemption application under the Electricity Act 1989: The Overhead Lines (Exemption)(England and Wales) Regulations 2009 for the installation of a new pole adjacent to the existing pole in situ, to provide additional support to the existing overhead line and to accommodate a pole transformer (PT)
-
01586/26/FMB Awaiting decision
Proposed 11,000kv Overhead Line Rebuild Minister Farm Partney Road Dalby Lincolnshire PE23 4PN
Form B application - Notification of proposed works to replace existing overhead line and poles.
-
01365/26/CMA Awaiting decision
Unit 9 Birch Court Spratt Close Boston Road Industrial Estate Horncastle Lincolnshire LN9 6SB
Planning Permission - Retrospective application for the retention of an open ended covered structure housing a baling machine (county matter application).